4
P/N 27740
10/11
WaLL sEt INstaLLatIoN
1. Symbols and Descriptions
APPLY ADHESIVE
where indicated. Apply 1/4" to 3/8"
round bead.
APPLY SEALANT
where indicated.
CAUTION:
A situation which, if not avoided, could
result in property damage or other undesirable conditions.
Product damage will occur and will void the warranty.
IMPORTANT!
Instructions which, if not followed, could
result in property damage. Product damage may occur
and will void the warranty.
2. Stud Placement
67"
7-1/4"
IMPORTANT!
Studs must be plumb and square to fl oor.
Inside corners must be square.
◘
Determine fixture locations for new plumbing installations
(See page 3, Roughing-In).
Install additional studs as shown to secure top fl anges.
Install additional studs as shown for side panel support.
Stud length must be 67" high and be located 7-1/4" from the
fl oor.
3. Install Back Support
30-1/2"
(77.5 cm)
Back panel
support
◘
Locate back panel support board 30-1/2" from base ledge.
◘
Secure board to studs using 1-1/4" drywall screws.
4. Prepare Back Panel
Verify straight
and square to base.
Square
Level
◘
Position back panel as shown.
CAUTION:
Drill 3/16" clearance holes into fl anges only.
Do not drill 3/16" holes directly into studs. Drill chuck can
damage panel. Use an extended bit holder to reduce risk of
drill chuck hitting panels.
◘
Drill 3/16" holes at all stud locations on top flange.