background image

 

 

13

EC DECLARATION OF CONFORMITY 

CE-KONFORMITÄTSERKLÄUNG 

DECLARACIÓN DE CONFORMIDAD DE LA CE 

DÉCLARATION DE CONFORMITÉ C.E.

 

 
 

MASALTA ENGINEERING CO., LTD 
20 Dalian Road, Baohe Industrial Estate, HeFei 230051, China 

 

hereby certifies that the construction equipment specified hereunder / bescheinigt, da. das Bauger.t / certifica 
que la máquina de construcción / atteste que le matériel : 
 
1.  Category / Art / Categoría

 /

 Catégorie:   

Tamping Rammer

 

 

2. 

Type / Typ / Tipo / Type: 

     

MR70H 

 
 

Has been sound tested per Directive 2000/14/EC/ In Übereinstimmung mit Richtlinie 2000/14/EG bewertet worden ist / Ha sido 

ensayado en conformidad con la norma 2000/14/CE/ A éré mis à I’épreuve conforme aux dispositions de la directive 2000/14/CEE: 

 

Conformity Assessment Procedure/ 
Konformitätsbewertungsverfahren/ 
Procedimiento para ensayar 
conformidad / Procédé pour   
I’épreuve de conformité 

Name and address of notified 
body / Bei folgender 
einbezogener Prüfstelle / 
Oficina matriculadora / 
Organisme agrée 

Measured sound power level / 
Gemessener Schallleistungspegel 
/ Nivel de potencia acústica 
determinado / Niveau de 
puissance acoustique fixé 

Guaranteed sound power level / 
Garantierter Schallleistungspegel / 
Nivel de potencia acústica 
garantizado / Niveau de puissance 
acoustique garanti 

Annex VI / Anhang VI / 

Anex VI / Annexe VI 

AV TECHNOLOGY 

AVTECH House, Arkle 

Avenue, Stanley Green 

Trading Estate Handforth, 

Cheshire, SK9 3RW, 

United Kingkom. 

MR70H 
with Petrole Engine    103dB 

MR70H 
with Petrole Engine    104dB 

 
 

has been produced in accordance with the following standards:/in übereinstimmung mit folgenden Richtlinien 
hergestellt worden ist:/ha sido fabricado en conformidad con las siguientes normas: / a été produit 
conformément aux dispositions des directives européennes ci-après : 

 
 

2005/88/EC 
2006/42/EC 
2004/108/EC/EN55012:2007 
EN500-1 
EN500-4 
 
 
 
 
 
 

15.02.10                     Hermann Josef Lensing 

---------------------------------------------------     Research and Development Manager 

Date / Datum / Fecha / Date

 

 

 

Содержание MR70H

Страница 1: ...WARNING R MR70H...

Страница 2: ...quickly working by applying consecutive impacts to the surface of soil in order to level the uneven soil surface to compact the soil uniformly so that the void among soil particles are minimized and...

Страница 3: ...to prevent the possibility of improper service damage to the equipment or personal injury Notes Notes contain additional Information important t a procedure CAUTION Cautions provide information import...

Страница 4: ...engine OFF when rammer is not being operated ALWAYS guide the rammer in such a way that the operator is not squeezed between the rammer and solid objects Special care is required when working on uneve...

Страница 5: ...alter engine speeds Run engine only at speeds specified in Technical Data Section Label Location ALWAYS replace safety devices and guards after repairs and maintenance ALWAYS keep area around muffler...

Страница 6: ...rmation No sparks flames or burning objects near the machine Shut off the engine before refueling Use only clean filtered unleaded gasoline WARNING Always wear hearing and eye protection when operatin...

Страница 7: ...n requesting service information the serial number should be specified of the unit Prior to Starting the Operation This machine is of oil bath lubrication system Check the oil level through a window a...

Страница 8: ...for machine 1 Turning the choke level to open the choke Running the engine for 5 minutes at low speed to warm the engine 2 Move the throttle level quickly to the FULL OPEN position DO NOT move the thr...

Страница 9: ...el of machine Check fuel line and fittings for cracks or leaks Tighten ramming shoe hardware Check and tighten engine cylinder screws Check and tighten external hardware Clean engine cooling fins Clea...

Страница 10: ...and pour a few drops of motor oil into cylinder Crank engine 3 to 4 times so that oil reaches all internal parts Clean exterior with a cloth soaked in clean oil Store unit covered with plastic sheet...

Страница 11: ...be such that air cleaner comes to top After laying it make sure that there is no leak of fuel from cap c 7 Make sure lifting device has enough capacity to hold machine see identification plate on mac...

Страница 12: ...clean ignition Fuel in use inadequate water dust Flush fuel system and replace with fresh fuel Mixed fuel quality is inadequate Check fuel to oil mixture Excessive carbon deposition in combustion cha...

Страница 13: ...ed of parts or major service be sure to see your dealer For your convenience we have provided this space to record relevant data about your Tamping Rammer These products are covered by warranty for a...

Страница 14: ...rmit Name and address of notified body Bei folgender einbezogener Pr fstelle Oficina matriculadora Organisme agr e Measured sound power level Gemessener Schallleistungspegel Nivel de potencia ac stica...

Страница 15: ...RING CO LTD Add 20 Dalian Road Baohe Industrial Estate Hefei China Tel 86 551 64846601 64846580 Fax 86 551 64846616 64846626 E mail sales masalta com cn masalta mail hf ah cn Http www masalta com cn V...

Отзывы: