INSTALL INFO Page
SYS Install Date: Set the date of UPS installation.
BAT Install Date: Set the date of Battery installation.
VOL CALI
VOL CALI Page1
Bus VOL: BUS voltage calibration. Click value columns and it will pop up
. Then, each click is 0.1% no
matter it’s pressing up or down key
. Press “up” key to increase 0.1% and press “down” key to decrease
0.1%. Press “OK” key to confirm the modification.
BATT VOL: Battery voltage calibration. Click value columns and it will pop up
. Then, each click is 0.1%
no matter it’s pressing up or down key
. Press “up” key to increase 0.1% and press “down” key to
decrease 0.1%. Press “OK” key to confirm the modification.
VOL CALI Page 2