© Martin Engineering GmbH
27
M3682UK-09/17
Installation
5.2.5
Aligning the mainframe parallel to the conveyor belt
Tab. 9: Top view of aligning the secondary cleaner in parallel to the
conveyor belt
1. Measure the clearance on both sides between the mainframe
and the head pulley or counter-pressure roller.
Fig. 21:
Item
Description
1
Top view of the blades
2
Driving drum
3
Driving drum axis
4
Chute wall
NOTE
The measurements must be the same on both sides.
4
1
3
2
A
A
Содержание SQC2
Страница 1: ...MARTIN SQC2TM Secondary cleaner Installation Instructions M3682UK...
Страница 2: ...Martin Engineering GmbH M3682UK 09 17...
Страница 54: ...Martin Engineering GmbH 52 M3682UK 09 17 Part numbers 9 9 SQC2 with SAF2 blades 0 5...
Страница 63: ...Martin Engineering GmbH 61 M3682UK 09 17 Part numbers 9 12 SQC2 mini secondary cleaner 5 0...
Страница 66: ...Martin Engineering GmbH 64 M3682UK 09 17 Part numbers 9 13 SQC2 tensioner...