background image

Important

MARTIN ENGINEERING HEREBY DISCLAIMS ANY LIABILITY FOR:  DAMAGE DUE TO 
CONTAMINATION OF THE MATERIAL; USER’S FAILURE TO INSPECT, MAINTAIN AND TAKE 
REASONABLE CARE OF THE EQUIPMENT; INJURIES OR DAMAGE RESULTING FROM USE OR 
APPLICATION OF THIS PRODUCT CONTRARY TO INSTRUCTIONS AND SPECIFICATIONS 
CONTAINED HEREIN. MARTIN ENGINEERING’S LIABILITY SHALL BE LIMITED TO REPAIR 
OR REPLACEMENT OF EQUIPMENT SHOWN TO BE DEFECTIVE.

Observe all safety rules given herein along with owner and Government standards and regulations.  Know 
and understand lockout/tagout procedures as defined by American National Standards Institute (ANSI) 
z244.1-1982,

 American National Standard for Personnel Protection - Lockout/Tagout of Energy Sources - 

Minimum Safety Requirements

 and Occupational Safety and Health Administration (OSHA) Federal 

Register, Part IV, 29 CFR Part 1910, 

Control of Hazardous Energy Source (Lockout/Tagout); Final Rule

.

The following symbols may be used in this manual:

DANGER

!

Danger

:  Immediate hazards that will result in severe personal injury or death.

 

WARNING

!

Warning:

  Hazards or unsafe practices that could result in personal injury.

CAUTION

!

Caution:

  Hazards or unsafe practices that could result in product or property damages.

IMPORTANT

Important:

  Instructions that must be followed to ensure proper installation/operation of equipment.

NOTE

Note:

  General statements to assist the reader.

Содержание M4097

Страница 1: ...Martin Air Cannon Controller multiple circuit Operator s Manual M4097...

Страница 2: ...an National Standards Institute ANSI z244 1 1982 American National Standard for Personnel Protection Lockout Tagout of Energy Sources Minimum Safety Requirements and Occupational Safety and Health Adm...

Страница 3: ...ontroller operation 1 References 2 Safety 2 Material required 2 Before Installing Controller 3 Installing Controller 4 Mounting enclosure 4 Wiring air cannon solenoids to controller 5 Wiring external...

Страница 4: ...oller disabled 2 2 Terminal Block Layout 5 3 Air Cannon Inputs 6 4 Air Cannon Controller Door 7 5 Off Time Selection 8 6 Display Screen Functions 9 7 Main Display Screen 9 8 Air Cannon Off Time Screen...

Страница 5: ...m the hopper the flow switch inputs are closed and the controller is enabled to begin the firing sequence Whenever material is flowing from the hopper the flow switch inputs are opened and the control...

Страница 6: ...29 CFR Part 1910 Control of Hazardous Energy Source Lockout Tagout Final Rule Department of Labor Occupational Safety and Health Administration OSHA 32nd Floor Room 3244 230 South Dearborn Street Chi...

Страница 7: ...ng equipment lock out tag out energy source to hopper conveyor and or conveyor accessories 3 Turn off and lock out tag out energy source according to ANSI standards see References WARNING If equipment...

Страница 8: ...contact to controller Mounting enclosure WARNING All electrical work must be done to National Electrical Code NEC standards 1 Determine location for controller CAUTION Do not mount controller in area...

Страница 9: ...to 2 supply and N etc Continue until all solenoids are connected 2 Connect ground wire from each solenoid to controller enclosure Route power wire 115 VAC 60 Hz into controller enclosure 3 Connect po...

Страница 10: ...switch to controller If not follow the procedures under After installing controller Wiring external flow switch to controller WARNING Before making any connections lock out tag out electrical supply...

Страница 11: ...enclosure to number of cannon you wish to fire Turn HAND OFF AUTO knob to HAND see Figure 4 hold for 1 second and release Selected cannon will fire and knob will return to OFF automatically 2 When fin...

Страница 12: ...programming the control system determine the number of air cannons to be controlled and the off time between firings Figure 5 Off Time Selection 1 2 3 4 5 6 Off Time Off Time Off Time Off Time Off Ti...

Страница 13: ...7 Main Display Screen Button Function ESC Cancels the current operation and returns to the immediately preceding operation Scrolls up the menu or increments the selected number Scrolls down the menu o...

Страница 14: ...value a Navigate to desired air cannon b Press and hold OK button until the time value flashes c Using the left and right arrow buttons navigate to the desired digit d Use the up and down arrow button...

Страница 15: ...Controller multiple circuit Parts Numbers Figure 10 Martin Air Cannon Controller multiple circuit P N 38901 Item Description Part No Qty 1 Air Cannon Controller NEMA 4 38901 1 2 Martin Products Label...

Страница 16: ...18 12 Martin Air Cannon Controller multiple circuit Note All dimensions are given in inches mm and are for reference only Figure 11 Air Cannon Controller Dimensions 8 14 207 12 16 309 8 00 203 14 38...

Страница 17: ...ies or regions Other trademarks and service marks belonging to Martin Engineering Company in the United States and or other countries or regions may be designated with the TM and SM symbols Brands tra...

Страница 18: ...ctical Resource for Total Dust and Material Control is a 576 page hard cover volume that provides information of value to industries where the efficient handling of bulk materials is a key to producti...

Отзывы: