Martin Engineering M3910-04/19
3
Martin
®
Electric Vibrators
Before Installing Vibrator
IMPORTANT
The delivery service is responsible for damage occurring in
transit. Martin Engineering CANNOT enter claims for
damages. Contact your transportation agent for more
information.
1. Inspect shipping container/pallet for damage. Report damage to delivery
service immediately and fill out delivery service’s claim form. Keep any
damaged goods subject to examination.
2. Remove vibrator from shipping container/pallet.
3. If anything is missing contact Martin Engineering or a representative.
WARNING
!
Turn off and lockout / tagout / blockout / testout all energy
sources to conveyor/loading systems to mounting structure.
4. Before installing vibrator, turn off and lockout / tagout / blockout / testout
all energy sources to conveyor/loading systems to mounting structure
according to ANSI standards (see “References”).
WARNING
!
If equipment will be installed in an enclosed area, gas level or
dust content must be tested before using a cutting torch or
welding. Using a cutting torch or welding in an area with gas
or dust may cause an explosion.
5. If using a cutting torch or welding, test atmosphere for gas level or dust
content.
6. Mounting surface must be strong and flat, 0.01 in. (0.25 mm) across
vibrator feet. (This will minimize internal stress to vibrator casting when
tightening mount bolts. Welding in the area of the mounting surface could
affect its flatness.)
7. Make sure mounting surface is free of paint and debris and foot of
vibrator is clean.
Before Installation
Содержание M3910
Страница 1: ...Martin Electric Vibrators Operator s Manual M3910...
Страница 30: ......
Страница 36: ......