WPM System
USER GUIDE
WPM
User Guide v1.0
Page 42
Ground Stacking WPM
Ground stacks of WPM cabinets are assembled using the touring Flying Frame. The front stabiliser bars provide a wide and
stable platform for assembling an array of up to six WPM cabinets.
Place the ground stack bar at the desired location. Position the first cabinet on top of the bar, aligning the lower front rigging
points with the rigging points on the bar. Secure with Rigging Pins.
Fig.24 - insert rigging pin
Fig.25 - insert rigging pin
Rotate the rear of the cabinet upwards and fix it in position with the long or short GS bar as specified in the DISPLAY 2.3
project (long GS bar shown here).
Fig.26 - rotate cabinet
Fig.27 - fit long GS bar
Содержание MSX Passive
Страница 1: ...User Guide WPM Optimised Line Array...
Страница 39: ...WPM System USER GUIDE WPM User Guide v1 0 Page 39 Fig 18 insert rigging pin Fig 19 insert rigging pin...
Страница 44: ...WPM System USER GUIDE WPM User Guide v1 0 Page 44 Fig 32 attach sixth cabinet Fig 33 complete ground stack...
Страница 56: ...WPM System USER GUIDE WPM User Guide v1 0 Page 56 Fig 70 complete array Fig 71 complete array...