VS-570-HDSDI User Manual
2.0 Megapixel Speed Dome Manual
19/54
Relay Output
Maximum allowable electrical load of relay is shown bellow table.
Drive Power
DC Power
AC Power
Max. Load
Max DC 24V, 1A
Max AC 125V, 0.5A
Check if it works
Once the power is supplied to the camera, it will start booting. The system will boot up to an operating mode
after approximately 40-60 seconds. The green LED on the Ethernet port will flash indicating the system is
ready.
The software provided in the CD called True Manager allows you to check the IP address and other network
details of the camera. Please refer to the True Manager manual for instructions on how to find the IP address
of the camera and change it if required.
OUT
1
AC or DC
LOAD
Internal
OUT
2
LOAD
OUT COM
Содержание VS-570-HDSDI
Страница 1: ...User Manual ver 1 0 VS 570 HDSDI 2 0 Megapixel Speed Dome v1 0 10062010570...
Страница 25: ...VS 570 HDSDI User Manual 2 0 Megapixel Speed Dome Manual 25 54 System Configuration...
Страница 29: ...VS 570 HDSDI User Manual 2 0 Megapixel Speed Dome Manual 29 54 Video Configuration...
Страница 35: ...VS 570 HDSDI User Manual 2 0 Megapixel Speed Dome Manual 35 54 Network Configuration...
Страница 40: ...VS 570 HDSDI User Manual 2 0 Megapixel Speed Dome Manual 40 54 Serial Configuration...
Страница 42: ...VS 570 HDSDI User Manual 2 0 Megapixel Speed Dome Manual 42 54 Event Configuration...
Страница 45: ...VS 570 HDSDI User Manual 2 0 Megapixel Speed Dome Manual 45 54 PTZ Configuration...
Страница 52: ...VS 570 HDSDI User Manual 2 0 Megapixel Speed Dome Manual 52 54 Camera Configuration...