79
Installation, Operation & Maintenance - HKV Series
Step 3: Remove screws from Control Box (Qty 4x) and
A) flip down, B) slide across and C) flip up as shown using the
guide rails inside as a guide. Re-attach control box with screws.
Right Side View
Step 4: Loosen Belt tension and take Belt off.
Step 5: Remove Bolt-Belt Adjustment ASM as shown.
Step 5
Step 4
Bolt-Belt Adjustment ASM
Screws
A
C
B