65
Installation, Operation & Maintenance - HKV Series
Installer:
Complete unit and system checkout and follow unit start-up procedures in the IOM. Use this form
to record unit information, temperatures and pressures during start-up. Keep this form for future reference.
Job Name:
Street Address:
Model Number:
Serial Number:
Unit Location in Building:
Date:
Sales Order No:
In order to minimize troubleshooting and costly system failures, complete the following checks and data
entries before the system is put into full operation.
Externat Static:
Sheave Setting:
Turns OPEN
Temperatures: F or C
Antifreeze:
%
Pressures: PSIG or kPa
Type:
Cooling Mode
Heating Mode
Return-Air Temperature
DB
WB
DB
Supply-Air Temperature
DB
WB
DB
Temperature Differential
Entering Fluid Temperature
Leaving Fluid Temperature
Temperature Differential
Water Coil Heat Exchanger
(Water Pressure IN)
Water Coil Heat Exchanger
(Water Pressure OUT)
Pressure Differential
Compressor
Amps
Volts
Discharge Line Temperature
Flow Rate GPM (l/s)
Motor
Amps
Volts
Allow unit to run 15 minutes in each mode before taking data
Do not connect gauge lines
Start-up Log Sheet