28
a)
b)
Fig. 20
4.5. Inspection of the lines placing
The packing employee will check the lines placing for correctness.
4.6. Placing of the canopy into the container
Risers of the harness are bent into the container. Attach the red threads with
strength 48 to 69 N to the red tape loops, sewn between the packaging flap
and the central part of the container (fig. 21).
Fig. 21
Содержание ATL-15 SL
Страница 2: ...2...
Страница 4: ...4...
Страница 13: ...13 Fig 5...
Страница 16: ...16 Fig 6...
Страница 22: ...22 Fig 12 Fig 13...
Страница 27: ...27 Fig 19 a b c d e...
Страница 41: ...41 Fig 45 Fig 46...
Страница 50: ...50...
Страница 51: ...51 The label completion and marking of the emergency parachute ATL 88 90 1B ATL 15 SL...