RECEIVING AND INSPECTION 

 

Upon receiving the product, check to make sure all 
items are accounted for by referencing the Bill of 
Lading to ensure all items were received.  Inspect 
each carton for shipping damage before accepting 
delivery.  Notify the freight carrier if any damage is 
noticed.  The carrier will make notification on the 
delivery receipt acknowledging any damage to the 
product. All damage should be noted on all copies of 
the Bill of Lading which is countersigned by the 
delivering carrier. A Carrier  Inspection Report 
should be  filled out by  the carrier  upon  arrival 
damaged upon arrival, file a claim immediately with 
the carrier. Any physical damage to the unit after 
acceptance is not the responsibility of Mars Air 
Systems. 

 

UNPACKING 

 

Verify that all parts, components and accessories, 
and the correct quantities of each have been 
received. If any items are missing, report shortages 
to Mars Air Systems directly to arrange for obtaining 
the missing items.  Again, verify quantities received 
against those on the Bill of Lading only, as multiple 
shipments may be involved. 

 

INSTALLATION 

 

Typical Mounting  –  Wall  or Ceiling  Mounted 
Horizontally Above the Door Opening 
 

1.  Overhead installation is recommended to 

prevent the possibility of the unit falling if the wall 
to which the unit is mounted is hit by a truck or 
material handling device. If,  however,  wall or 
bracket mounting is preferred, additional holes 
may be drilled in the side panels of the housing. 
 

Note

: Bracket/Support mounting is not generally 

recommended for Air Curtains equipped with 
steam or hot water coils. Overhead installation 
using 

threaded rods with independent 

suspension of coils is recommended. 
 

2.  Center the unit over the opening. The air curtain 

shall be equal to or greater than the width of the 
opening. 

3.  Four pre-punched 1/2” mounting holes on the top 

of the unit are provided for your convenience. 
These holes must be utilized to secure the 
product overhead. All hardware is field provided 
by others. 

4.  Mount the product such that the discharge is 1” 

above the opening and all obstacles. (FIG. 1) 

 

Note

: If the product is installed higher  than the 

recommended 1” above the opening, then it 
must be moved 3/8” away from the wall for every 
1” that it is moved up. Any void between the wall 
and the product must be sealed, by others, to 
optimize performance. 

 

 

FIG. 1 

 

5.  Use four (4) threaded rods for overhead 

installation or four (4) threaded bolts for wall 
installation. All hardware is field provided by 
others. (FIG. 1) 

6.  If applicable, for tandem installation or products 

mounted side by side, allow no more than 6” 
between the two products. For overhead 
installation using threaded rods, the products 
may require a beam, by others, to span the full 
distance of the mounting length. (Reference 

Accessory Installation Supplement

7.  All wires must be connected to the external 

junction box(s) of the unit. 

8.  The unit must be wired per NEC and local codes. 

 

 

Electrical Field Wiring  

 

The unit and any optional accessories must be wired 
with the proper voltage to the junction box per the 
wiring diagram. (FIG. 2, unheated products only) 

 

 

 

 WARNING 

Precaution should be taken in explosive atmospheres. 

Содержание 03-001

Страница 1: ...come standard with an expanded metal air intake grille s The BD Series can be configured with Flat Bank or V Bank Sections as options GENERAL SAFETY INFORMATION Use this product only in the manner int...

Страница 2: ...acket Support mounting is not generally recommended for Air Curtains equipped with steam or hot water coils Overhead installation using threaded rods with independent suspension of coils is recommende...

Страница 3: ...shipped G Verify voltage to the product once more and turn power on H Regardless of whether the product is mounted on the inside or outside of the door opening set the air directional vanes in the dis...

Страница 4: ...ck bearings require periodic greasing depending on use The Zerk fittings are provided on bearing 7 To re install the product reverse the procedures above 8 Reconnect the power source to the product 9...

Страница 5: ...on on intake or discharge Remove obstruction or move air curtain Power leads out of polarity Switch power leads to correct polarity 3 phase models only Blower motor rotating below normal speed Apply p...

Страница 6: ...ema 1 1 115 1 1 6 2 4 03 015 7124 1096 Genteq Nema 1 1 208 230 1 6 5 9 2 03 015 Nidec Nema 1 1 208 230 1 4 3 6 5 03 014 K55BWJZB 2362 US Nema 1 1 115 1 1 2 1 03 015 US Nema 1 1 208 230 1 3 2 6 3 Black...

Страница 7: ...rrupted or error free operation of Mars product Under no circumstance is Mars liable for any of the following 1 Third party claims against you for damages or 2 Special incidental or indirect damages o...

Отзывы: