•
•
Water System Overview
•
Water
level
in
the
reservoir
should
be
set
to
the
water
level
line
while
operating.
Looking
at
the
center
picture
take
note
that
with
proper
water
level
setting
the
top
evaporator
coil
should
be
covered
with
water.
•
During
installation
the
float
should
be
verified
for:
•
Proper
water
level.
•
System
safety
shutdown.
•
Typically
water
pressure
would
be
regulated
if
greater
than
50
psi.
•
Make
provisions
for
plastic
tubing
overflow
lines
as
well.
Содержание 621058724
Страница 1: ...2019 Ice Maker Training Feb 2019 1...
Страница 7: ...Pictorial representation...
Страница 26: ...Soft Ice Dispensing Tips Take note in regards to the IDC ED units...
Страница 29: ...Pictures of IDC Ice Slide helps better direct the ice flow IDC Pro Agitator Ice Slide...
Страница 33: ...Questions...