Before beginning installation, thoroughly review the following instructions to familiarize yourself with
the general placement and identification of all components.
These instructions are written for a single unit installation, but they also generally apply to twin and
triple units. Refer to specific equipment layout drawing, water meter installation instruction, and
interconnecting electrical wiring diagram for your system.
Minimum operating pressure is 30 psi.
If pressure less then 30 psi is encountered, a pump must be installed.
Maximum operating pressure is 100 psi.
If pressure greater then 100 psi is encountered, a pressure regulator must be installed.
Power requirements are shown on electrical wiring diagram.
Standard units are designed to soften unheated water in the range is 35-100
F.
Special valve assemblies are available to handle heated water supplies exceeding 100
°
F.
Consult factory if applicable.
Catalog softeners are shipped fully assembled with face piping and controllers. Care must be taken
not to damage valves or controllers during uncrating and installation.
During unpacking the brine tank miscellaneous parts are shipped inside the brine tank. These parts
include hardness test kit, injectors, extra manuals and other parts that may apply to your particular
system. Care should be taken when unpacking the brine tank.
SOFTENER LOCATION
1. Select a position near a floor drain that has adequate carrying capacity to handle the water
softener backwash rate. See the Specification Table for the backwash rate of your system.
2. Refer to your specific equipment layout drawing located on page 31 for tank locations. The
approximate dimensions required for your particular system is shown on page 4. Make sure the
softeners are placed on a level concrete surface.
Page 6
MR 150M–1050M PLC
INSTALLATION
Содержание MR Series
Страница 7: ...MR 150M 1050M PLC CONTROLLER SYSTEM INFORMATION 4 Page 4 MR 150M 1050M PLC INSTALLATION ...
Страница 11: ...MR 150M 1050M PLC CONTROLLER INSTALLATION 8 TUBING DIAGRAM VALVE NEST MULTITANK ASCO SOLENOID ...
Страница 31: ...MR 150M 1050M PLC CONTROLLER OPERATION 28 PAGE 28 FLOW DIAGRAM Page 28 MR 150M 1050M PLC OPERATION ...
Страница 36: ...MR 150M 1050M PLC CONTROLLER MAINTENANCE 33 ...
Страница 37: ...MR 150M 1050M PLC CONTROLLER MAINTENANCE 34 ...
Страница 38: ...MR 150M 1050M PLC CONTROLLER MAINTENANCE 35 ...
Страница 39: ...MR 150M 1050M PLC CONTROLLER MAINTENANCE 36 ...
Страница 40: ...MR 150M 1050M PLC CONTROLLER MAINTENANCE 37 ...
Страница 41: ...MR 150M 1050M PLC CONTROLLER MAINTENANCE 38 ...
Страница 42: ...MR 150M 1050M PLC CONTROLLER MAINTENANCE 39 ...
Страница 51: ...MR 150M 1050M PLC CONTROLLER 48 NOTES ...
Страница 52: ...2227 South Street P O Box 044170 Racine WI 53404 7003 www Marlo Inc com 8 217 R5 ...