5
10. Pull the projection profile (13)
as far as possible into the direc-
tion of the glider (7). Push the
glider (7) towards the casing us-
ing appropriate tools (14).
Attention!: Watch out!
Tension is building up here.
11. Push the glider (7) behind the
projection profile and hook the
bolt (15) of the projection profile
into the opening of the gliders (7)
(right and left).
12. Screw threaded pins SW 2.5 in
the glider to secure the projection
profile (17). Bolt together awning
wire with projection profile (16)
(right and left). Connect mount-
ing switch and/or put hand crank
on drive.
13. Lift up awning uniformly and
let lock in the bracket and screw
together ...
14. ... direct with the clamping
jaws (19) of the brackets SW 6.
5. Motor-driven awning
5.1 Motor connection
The electrical connection for the motor drive and/or control system connection is to be carried out accord-
ing to the instructions of the manufacturer of the motor and control system. Modifications, especially in
the motor's, the control system's and the connecting cable's area require a written permit.
The installation and setting instructions are indicated on the motor's power supply cable. Instructions for
further electrical components are to be found in the corresponding packaging.
Sense of rotation during retraction
Attention!:
The rolling up of the fabric on the fabric roller
from below during retraction could lead to damage
to the awning. When changing the end stop, it is
indispensable to pay attention to the sense of rota-
tion!