i
TABLE OF CONTENTS
1. INTRODUCTION
1.1 To The Kitchen Manager
..................................1.1
1.2 Description
........................................................1.1
1.3 Cooking Capacities
...........................................1.1
1.4 Basic Functioning
.............................................1.1
1.5 Service
..............................................................1.1
2. INSTALLATION
2.1 Setting In Place
................................................2.1
2.2 Service Connections
.........................................2.1
2.2.1 Water Connections
........................................2.1
2.2.2 Electrical Connections
...................................2.1
Figure 2.1 Service Connections
.............................2.1
2.3 Reversing The Doors
........................................2.2
Figure 2.2 Domestic & Export Heater Wiring
& Ratings
................................................................2.2
3. INITIAL SYSTEMS INSPECTION
3.1 General .............................................................3.1
Figure 3.1 Controls & Indicators
.............................3.1
3.2 Warm Up
..........................................................3.1
3.3 Steam Demand.................................................3.1
3.4 Steam Mode .....................................................3.1
3.5 Steam & Hold Mode
.........................................3.1
3.6 Constant Steam ................................................3.1
3.7 Steam Suppression
..........................................3.2
3.8 Shut Down ........................................................3.2
4. OPERATION
4.1 Controls & Indicators
........................................4.1
4.2 Operating Procedures
......................................4.1
4.2.1 Start-Up & Preheating
...................................4.1
4.2.2 Cooking
.........................................................4.1
4.2.3 Shut Down .....................................................4.1
Table 4.1 Controls & Indicators
...............................4.1
Figure 4.1 Control Panel
.........................................4.2
Figure 4.2 Daily Cleaning/Parts List
.......................4.3
4.3 Daily Cleaning
..................................................4.4
4.4 Prolonged Shut Down & Cleaning
....................4.4
5. TROUBLE-SHOOTING
5.1 General .............................................................5.1
Trouble-Shooting Guide
.........................................5.1
5.2 Water Level Control Board
...............................5.2
5.2.1 Testing The Water Fill Relay
..........................5.3
5.2.2 Testing The Low Water Relay
........................5.3
Figure 5.1 Water Level Control Board
....................5.3
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
6. MAINTENANCE
6.1 General .............................................................6.1
6.2 Daily Cleaning
..................................................6.1
6.3 Preventive Maintenance
...................................6.1
6.4 Cleaning The Generator
...................................6.1
6.4.1 Cleaning Instructions
.....................................6.1
Figure 6.1 Exterior Steal-Metal Cover Panel &
Fasteners/Parts List
................................................6.2
6.5 Cleaning The Steam ventilation Ductwork
........6.3
6.6 Electrical Box Service Access
..........................6.3
Figure 6.2 Electrical Panel Assembly/Parts List
.....6.4
Figure 6.3 Timer Settings & Terminal no.’s & Locations/
Relay Terminal Contact no.’s & Locations
.............6.5
Figure 6.4 Principles of Operation Schematic
........6.6
Figure 6.5 Single Compartment System Wiring
Diagram
..................................................................6.7
Figure 6.6 Single Compartment System Wiring
Diagram
..................................................................6.8
6.7 Control Panel Electrical Service Access
...........6.9
6.8 Door Adjustment ...............................................6.9
6.8.1 Door Alignment
..............................................6.9
Figure 6.7 Control Panel Assembly/Parts List
........6.9
6.8.2 Door Latch Tension Adjustment
.....................6.10
6.8.3 Door Handle tension Adjustment
...................6.11
Figure 6.8 Door Latch & Magnet Sensor Assembly/
Parts List
.................................................................6.11
Figure 6.9 Cooking Compartment Door Assembly/
Parts List
.................................................................6.12
6.9 Door Gasket Replacement
...............................6.13
Figure 6.10 Single Electric Powered Steam Generator
Assembly/Parts List
................................................6.13
6.10 Solenoid Fill Valve Strainer Screen Cleaning
.6.14
6.11 Blower Box Assembly/Parts List
.....................6.15
Figure 6.12 Tempering Tank Assembly/Parts List
...6.15
Figure 6.13 Chassis Assembly/Parts List
...............6.17
Figure 6.14 tubing Routing/Parts List
.....................6.19
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Содержание STEAM-TECH PLUS STP-6E
Страница 20: ...6 5 6 MAINTENANCE FIGURE 6 3 ...
Страница 21: ...6 6 6 MAINTENANCE FIGURE 6 4 PRINCIPLES OF OPERATION SCHEMATIC ...
Страница 22: ...6 7 6 MAINTENANCE FIGURE 6 5 SINGLE COMPARTMENT SYSTEM WIRING DIAGRAM ...
Страница 23: ...6 8 6 MAINTENANCE FIGURE 6 6 SINGLE COMPARTMENT SYSTEM WIRING DIAGRAM ...
Страница 27: ...6 12 6 MAINTENANCE FIGURE 6 9 COOKING COMPARTMENT DOOR ASSEMBLY ...
Страница 31: ...6 16 6 MAINTENANCE FIGURE 6 12 TEMPERING TANK ASSEMBLY ...
Страница 32: ...6 17 6 MAINTENANCE FIGURE 6 13 CHASSIS ASSEMBLY ...
Страница 34: ...6 19 6 MAINTENANCE FIGURE 6 14 TUBING ROUTING ...