6    Secure 2 deformation brackets 

E

 with the attached UA 

profile 

J

 to the load-bearing structure using 2 x Fischer 

FAZ M12 anchors 

(tightening torque 60 Nm). Clean 

the drilled holes and position the anchor 

G

 (FAZ M12).

3.    Screw on two deformation brackets 

E

 back to back 

on the UA profile 

J

 with two M8 screws 

H

 and a 

counterplate 

F

 (do not fully tighten the screws at this 

point). 

Align the deformation bracket 

E

 to the slots of the UA 

profile 

J

, in which case the position of the M8 screws 

H

, washer 

I

 and counterplates 

F

 must always be 

chosen to be similar to Figure 3.1.

4.    The M8 screws 

H

 must not be inserted at the open 

end of the slots of the UA profile 

J

If there are open slots at the top or bottom end of the 

UA profile 

J

, then the next slot pair with closed ends 

must be used.

5.    Mark holes for screw holes on the ceiling and drill 2 x 

12 mm holes to a depth of 110 mm. 

7.    Secure absorber 

B

 to the lower end of the UA profile 

J

 with 2 x M8 screws 

H

 and a counterplate 

F

 and 

align to the slots so that the absorber 

B

 is precisely 

horizontal and 12.5 mm higher than the prepared 

soffit. (see Figure 3.1.)

 8.    Tighten M8 screws 

H

 on the top and bottom 

(tightening torque 27 Nm).

9.    Adjust the ceiling cladding or acoustic plate, calibrate 

the central point of the absorber 

B

 and cut out an 

opening with a hole cutter. 

If necessary, first cut out a hole roughly the size of a 

coin at the calibrated position, align the hole cutter 

with the central hole of the absorber 

B

 and cut out 

the circular hole. Secure ceiling cladding and level 

out or insert the acoustic plate.

10.   Completion:  

Secure socket 

C

 and anchor point 

A

 with 

2 countersunk screws 

D

. When doing so, the 

“front side” marking on the buckle must be visible. 

If necessary, correct the position of the absorber 

B

 

so that the socket 

C

 is flush with the soffit (visual 

inspection).

Figure 3.1

11.   Complete the installation report and inspection report 

(enclosed). Observe periodic inspections. 

Observe instructions for use for MARK Secure 2 on 

the following pages.

Содержание Secure 2

Страница 1: ...2 Instruction manual Anchor point for reinforced concrete ceiling suspended ceiling system socket installation Anchor device type A according to EN 795 2012 MARK Save A Life GmbH Gleinkerau 23 4582 S...

Страница 2: ...oduct The instruction manual the installation report and the inspection report are available to download at www savealife at Read through the instruction manual carefully before you use this product f...

Страница 3: ...uct as an anchor device according to EN 795 2012 type A The product may be used within the intended use conditions on the specified wall and attachment shell systems from Knauf Gesellschaft m b H or s...

Страница 4: ...amage storage and transport can all reduce the service life of this product The product features a fall indicator which clearly shows whether the anchor device has been subjected to the stress of a fa...

Страница 5: ...person Fasteners 2 x stainless steel screws countersunk head M10x25 2 x deformation brackets 2 x Fischer FAZ II 12 10 4 x screws M8 x 25 8 8 galvanised 4 x washers 8 4 x 25 galvanised 2 x counterplat...

Страница 6: ...the lower end of the UA profile J with 2 x M8 screws H and a counterplate F and align to the slots so that the absorber B is precisely horizontal and 12 5 mm higher than the prepared soffit see Figure...

Страница 7: ...nsely the product is used as well as on the operating environment If the product is subjected to extremely heavy stress the inspection must be performed more than once a year 8 Disposal MARK Save A Li...

Страница 8: ...l the emergency services Lower the person who needs to be rescued Place the person on the floor with the upper body elevated in a sitting or squatting position Release the straps and any restricting c...

Страница 9: ...ruction project Component Storey section Room no Installer No of anchor points according to plan 16 17 Installation report for MARK Secure 2 Reinforced concrete ceiling suspended ceiling system socket...

Страница 10: ...t muss mindestens einmal j hrlich je nach Verwendungsumgebung und intensit t aber auch fter von einer sachkundigen Person gepr ft werden Diese Pr fung gilt nur unter Vorbehalt dass dieses Produkt gem...

Страница 11: ...nly permitted to make changes to reprint or photographically reproduce this document in whole or in part with the express consent of MARK Save A Life GmbH Gleinkerau 23 4582 Spital am Pyhrn MARK Save...

Отзывы: