Mark Secure 2 Скачать руководство пользователя страница 5

4. MARK Secure 2 installation instructions

Reinforced concrete ceiling, suspended ceiling 
system, socket installation  
 

Anchor device type A according to EN 795:2012 for 
installation on reinforced concrete ceilings or reinforced 
concrete beams of suspended, non-load-bearing ceilings 

made  of  plasterboard,  mineral  fibre  or  wood  wool  plates 

of types Knauf D11, D12, D13 and on AMF mineral fibre 

ceilings or similar products with the same properties. 
Suitable for vertical load due to a fall from height.

Maximum expected total deformation of the installation 
base and the anchor point due to a fall from a height: 
15 cm vertical. Adjust the length of the connector based on 
conditions on site.

Installation: 

This product may only be installed as per this instruction manual. MARK Save A Life GmbH recommends it is installed by 
a specialist company.

3.3 Technical details

Installation base, components,  
tools, operating conditions

Approved for Knauf systems or similar products 
with the same properties

D11, D12, D13 and AMF mineral fibre ceilings

Test standard, permissible number of people

EN 795:2012, 1 person

Fasteners

2 x stainless-steel screws, countersunk head 
M10x25 
2 x deformation brackets
2 x Fischer FAZ II 12/10
4 x screws M8 x 25 8.8 galvanised 
4 x washers 8.4 x 25 galvanised 
2 x counterplates 2-hole

Drill

Masonry drill bit 12 mm

Screw-in depth

100 mm

Hole cutter

95 mm with centring drill 6 mm

Torque wrench

13 mm nut and 19 mm nut, Allen socket 6 mm

Tightening torques

M8: 27 Nm, M10: 20 Nm, M12: 60 Nm

Quality of the installation base 
(static load-bearing capacity of the structure 
must be guaranteed)

≥ C 20/25

Addition

Installation only on load-bearing ceilings or 
beams made of reinforced concrete

Distance from edge

≥ 55 mm

Thickness of non-load-bearing cladding 
(plasterboard, insulation)

1-3 layer cladding 12.5 mm/35 mm MF or WW

Permissible load directions

Vertical

Separation height

110 mm to 3000 mm

Maximum expected deformation due to a 
fall from a height

≤ 150

Fig. Side view

8

            

9

            

Absorber B

UA profile J 75 mm

2.   Measure the separation height of the suspended 

ceiling (distance between lower edge of unfinished 

ceiling and upper edge of suspended ceiling).  

Cut UA profile 

J

 to this measurement. 

 

1.   Mark the position of anchor point 

A

 on the unfinished 

ceiling. In the case of grid ceilings, in each case the 

anchor point is positioned in the centre of the field of 

a MF or WW plate.

Содержание Secure 2

Страница 1: ...2 Instruction manual Anchor point for reinforced concrete ceiling suspended ceiling system socket installation Anchor device type A according to EN 795 2012 MARK Save A Life GmbH Gleinkerau 23 4582 S...

Страница 2: ...oduct The instruction manual the installation report and the inspection report are available to download at www savealife at Read through the instruction manual carefully before you use this product f...

Страница 3: ...uct as an anchor device according to EN 795 2012 type A The product may be used within the intended use conditions on the specified wall and attachment shell systems from Knauf Gesellschaft m b H or s...

Страница 4: ...amage storage and transport can all reduce the service life of this product The product features a fall indicator which clearly shows whether the anchor device has been subjected to the stress of a fa...

Страница 5: ...person Fasteners 2 x stainless steel screws countersunk head M10x25 2 x deformation brackets 2 x Fischer FAZ II 12 10 4 x screws M8 x 25 8 8 galvanised 4 x washers 8 4 x 25 galvanised 2 x counterplat...

Страница 6: ...the lower end of the UA profile J with 2 x M8 screws H and a counterplate F and align to the slots so that the absorber B is precisely horizontal and 12 5 mm higher than the prepared soffit see Figure...

Страница 7: ...nsely the product is used as well as on the operating environment If the product is subjected to extremely heavy stress the inspection must be performed more than once a year 8 Disposal MARK Save A Li...

Страница 8: ...l the emergency services Lower the person who needs to be rescued Place the person on the floor with the upper body elevated in a sitting or squatting position Release the straps and any restricting c...

Страница 9: ...ruction project Component Storey section Room no Installer No of anchor points according to plan 16 17 Installation report for MARK Secure 2 Reinforced concrete ceiling suspended ceiling system socket...

Страница 10: ...t muss mindestens einmal j hrlich je nach Verwendungsumgebung und intensit t aber auch fter von einer sachkundigen Person gepr ft werden Diese Pr fung gilt nur unter Vorbehalt dass dieses Produkt gem...

Страница 11: ...nly permitted to make changes to reprint or photographically reproduce this document in whole or in part with the express consent of MARK Save A Life GmbH Gleinkerau 23 4582 Spital am Pyhrn MARK Save...

Отзывы: