3-5
Section 3
Ice Machine Operation
HARVEST SEQUENCE WATER PURGE
The harvest sequence water purge adjustment may be
used when the ice machine is hooked up to special
water systems, such as a de-ionized water treatment
system.
Important
The harvest sequence water purge is factory-set at
45 seconds. A shorter purge setting (with standard
water supplies such as city water) is not
recommended. This can increase water system
cleaning and sanitizing requirements.
•
The harvest sequence water purge may be set to
15, 30, or 45 seconds.
•
During the harvest sequence water purge, the
water fill valve energizes and de-energizes by
time. The water purge must be at the factory
setting of 45 seconds for the water fill valve to
energize during the last 15 seconds of the water
purge. If it is set to less than 45 seconds, the
water fill valve will not energize during the water
purge.
WARNING
Disconnect the electrical power to the ice machine
at the electrical disconnect before proceeding.
For your safety, and to eliminate errors, we
recommend that a qualified service technician make
the harvest water purge adjustment.
Water Purge Adjustment
SV1617
CONTROL
BOARD
WATER PURGE
ADJUSTMENT
Содержание P Series
Страница 2: ...Part Number 80 1125 3 ...
Страница 4: ......
Страница 11: ...1 4 General Information Section 1 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 24: ...3 3 Section 3 Ice Machine Operation THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 27: ...3 6 Ice Machine Operation Section 3 THIS PAGE INTENTIONALLY LEFT BLANK ...