BOOM MAINTENANCE
NBT40 SERVICE MANUAL
4-8
Published 8-01-2017 Control # 287-11
24.
Place the 3rd, and 4th stage booms on a suitable
horizontal surface.
NOTE:
Use caution not to pinch or crush retract cables
while lifting or supporting 3rd stage boom.
25.
Tag and remove rear wear pads and shims from base of
3rd stage boom if replacing.
26.
Remove the 1/2/3 extend cable (10) from top of 3rd
stage boom base. Slide the top center rear sheave (71)
toward the rear of boom and remove. Pull the cable (10)
loop forward and remove from sheave keeper. Cable is
now free at base of boom. Push the two sheaves at the
front tip of the 2nd stage boom forward and remove
them from the 1/2/3 extend cable sheave case assembly
(44) and sheaves (46) previously removed and stored at
the tip of the 3rd stage boom. The cable loops may now
be pulled back out of the sheave case and the 1/2/3
extend cable is free. Smooth out any burrs which may be
present on the flat ends of the pins to eliminate sheave
bearing damage and if necessary to remove pins from
tip sheaves (47).
27.
Loosen and remove two capscrews (27) retaining wear
pad (72) to top base of 3rd stage boom. Loosen and
remove two capscrews (48) lockwashers (49) and
keepers (50) which anchor the extend cylinder (5) at the
center base of the 3rd stage boom. Attach a sling to the
base of the extend cylinder and pull the extend cylinder
out of the 3rd stage boom approximately one foot
keeping 2/3/4 extend cables taunt. Raise and support
extend cylinder approximately five inches using a
suitable block (wood).
NOTE:
Avoid damage to retract cable roller (65) when
lifting cylinder.
28.
Remove capscrew (74) and retract cable roller (65) from
each side of the bottom base of the 3rd stage boom. Pull
the retract sheave pin (38) with retract sheaves
assemblies (34,35,36,37) back out of its slot at the
bottom base of the 3rd stage boom. Smooth out any
burrs which may be present on flat ends of pin to
eliminate sheave bearing damage if sheaves are
removed from pin. Stow cable (53) out of way to avoid
damage.
29.
Push the 4/3/2 retract cable anchor assembly (78)
forward out of its slot in the bottom base of the 4th stage
boom and remove from 4th stage boom with wear pad
(112) attached
.
Remove 4/3/2 retract cables (53) from 4/
3/2 retract anchor (78) and store in an area where they
will not be damaged during further boom disassembly.
30.
Mark the location of the nuts which secure the 4/3/2
retract cables (53) to the tip of the 2nd stage boom and
loosen nuts (12,113) and remove plate (26) and
capscrew (27) from the threaded cable end.
31.
Pull the 4/3/2 retract-2/3/4 extend pin (77) with cables
(29) as an assembly out of slot in the bottom base of the
4th stage boom and drape out of the base of the 3rd
stage boom.
32.
Lower extend cylinder (5) to original position. Attach a
sling or chain to the tip of the 4th stage boom and pull
the 4th stage boom out of the 3rd stage boom
approximately one foot. Remove the extend cylinder
from the boom, keeping the 2/3/4 extend cables (29)
taunt.
33.
Remove rods (146) and roller (147) and plate (148) from
cylinder sheave case tip. Remove sheaves (83) from
extend cylinder, if necessary by removing two
capscrews (81) and the keeper (150) from the sheave
pin (142) and lightly tapping the pin while removing the
sheaves from the tip of the extend cylinder.
34.
Remove wear pads (144,145) if replacement is
necessary.
35.
Remove the 2/3/4 extend cables (29) from the 4/3/2
retract-2/3/4 extend pin and store cables and extend
cylinder in an area where they will not be damaged
during further boom disassembly.
36.
Remove wear pads (17) from bottom tip of 3rd stage
boom.
37.
Place the 4th stage boom on a suitable horizontal
surface. Take care not to pinch or crush the retract and
extend cables while lifting or supporting the 4th stage
boom. If necessary, tag and remove wear pads
(69,68,67) and shims from the base of the 4th stage
boom.
38.
Remove loadline sheaves (94) if desired, by removing
two capscrews, two lockwashers and the keeper (82)
from the sheave pins (90,96) and lightly tapping the pin
while removing sheaves and spacers until all sheaves
are removed from boom tip.
Additional Maintenance, Disassembled
Boom
1.
Clean all boom sections and inspect for wear, dents,
bent or crooked boom sections, gouged metal, broken
welds or any abnormal conditions. Repair or replace as
required.
2.
Inspect all sheaves for excessive groove wear or
abnormal rim wear. Replace as required.
3.
Inspect all sheave bearings for excessive wear or cut
inner liner material. If installed bearing diameter is
0.38 mm (0.015 in) larger than pin diameter, bearing
must be replaced. Any cut or gouge which causes the
bearing liner to lose strands is cause for bearing
replacement.
Reference Only
Содержание National Crane NBT40 Series
Страница 1: ...Service Manual National Crane NBT40 Series R e f e r e n c e O n l y ...
Страница 2: ...R e f e r e n c e O n l y ...
Страница 122: ...BOOM MAINTENANCE NBT40 SERVICE MANUAL 4 48 Published 8 01 2017 Control 287 11 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 136: ...HOIST NBT40 SERVICE MANUAL 5 14 Published 8 01 2017 Control 287 11 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 162: ...OUTRIGGERS NBT40 SERVICE MANUAL 7 10 Published 8 01 2017 Control 287 11 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 214: ...CRANE INSTALLATION NBT40 SERVICE MANUAL 9 36 Published 8 01 2017 Control 287 11 7488 4 7488 6 R e f e r e n c e O n l y ...
Страница 216: ...SCHEMATICS NBT40 SERVICE MANUAL 10 2 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 218: ...NBT40 SERVICE MANUAL APL 2 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 219: ...R e f e r e n c e O n l y ...
Страница 220: ...R e f e r e n c e O n l y ...