9
National Crane
Published 8-01-2017 Control # 287-11
9-31
NBT40 SERVICE MANUAL
CRANE INSTALLATION
Counterweight Installation
1.
Position the crane on a firm level surface. Fully extend
and set the outriggers
2.
Position the superstructure over the front of the machine
and engage the turntable lock.
3.
Install two lifting bolts into the 1.25 x 7 UNC lift inserts (2,
Figure 9-19). Using a proper lifting device attach straps
to each bolt, lift and place the counterweight inside the
crane support weldment.
4.
With the lifting device still attached, align the two
counterweight and crane support weldment holes and
install two bolts (1, Figure 9-20), lockwashers (2), nuts
(3).
Counterweight Table
Model
Plate Part Number
Description
Figure 9-20 Letter Call Out
NBT36
N/A
N/A
N/A
NBT40 Standard
80018805
1000 lbs
A
NBT40 + 1000 Option
80018805 (2)
2000 lbs
B
NBT45 Standard
80018804
4500 lbs
C
NBT45 + 1000 Option
80020222
5500 lbs
D
A
B
C
FIGURE 9-20
1,2,3
1,2,3
1,2,3
1,2,3
D
Reference Only
Содержание National Crane NBT40 Series
Страница 1: ...Service Manual National Crane NBT40 Series R e f e r e n c e O n l y ...
Страница 2: ...R e f e r e n c e O n l y ...
Страница 122: ...BOOM MAINTENANCE NBT40 SERVICE MANUAL 4 48 Published 8 01 2017 Control 287 11 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 136: ...HOIST NBT40 SERVICE MANUAL 5 14 Published 8 01 2017 Control 287 11 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 162: ...OUTRIGGERS NBT40 SERVICE MANUAL 7 10 Published 8 01 2017 Control 287 11 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 214: ...CRANE INSTALLATION NBT40 SERVICE MANUAL 9 36 Published 8 01 2017 Control 287 11 7488 4 7488 6 R e f e r e n c e O n l y ...
Страница 216: ...SCHEMATICS NBT40 SERVICE MANUAL 10 2 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 218: ...NBT40 SERVICE MANUAL APL 2 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 219: ...R e f e r e n c e O n l y ...
Страница 220: ...R e f e r e n c e O n l y ...