Part Number: 000013325 Rev 01 4/16
23
Section 2
Installation
Step 5
Open Valves for the Line Set and Receiver.
You will not hear refrigerant flow when the valves are
opened. Refrigerant will not flow until the ice machine is
started and the solenoid valve opens.
•
All valve caps must be reinstalled, tightened and leak-
checked to assure no refrigerant leakage exists.
•
Counterclockwise opens all valves:
A. Refer to chart and open the shutoff valves for the
suction and liquid lines the correct number of 360°
turns.
Valve Tubing Size
Number of Turns to Open
3/8"
6
1/2" 5/8" 3/4"
10
7/8"
14
B. Open the receiver service valve until backseated
(when used).
USE ALLEN WRENCH TO OPEN
(TURN COUNTERCLOCKWISE)
SHUTOFF VALVES FOR THE LIQUID
AND SUCTION LINES
QuietQube Models
USE ALLEN WRENCH
TO OPEN (TURN
COUNTERCLOCKWISE)
SHUTOFF VALVES
FOR THE LIQUID AND
SUCTION LINES
Ice Beverage Models
USE ALLEN WRENCH
TO OPEN (TURN
COUNTERCLOCKWISE)
SHUTOFF VALVES
FOR THE LIQUID AND
SUCTION LINES
I1470C/I1870C/I2170C
Caution
After opening suction, discharge and receiver service
valves, refrigerant pressure will not be detected until
the ice machine starts a freeze cycle and the solenoid
valves energize.