INTRODUCTION
CD5515-2/YB5515-2 SERVICE MANUAL
1-22
Published 1-20-2017, Control# 483-02
O-RING, SEAL AND ELASTIC NUT
REPLACEMENT
Replace O-rings and gaskets whenever they are disturbed.
Never mix new and old seals or O-rings regardless of
condition. Always lubricate new seals and O-rings (unless
stated otherwise) with 10W30 oil or petroleum jelly before
installation. Replace all used elastic locknuts with new parts.
HYDRAULIC PRESSURE TESTING
Prior to pressure testing, be sure all hoses are in good
condition and all fittings are tight.
Use a pressure gauge with a range that is high enough to
measure the specific pressure.
Comply with the correct procedure to inhibit damage to the
system or the equipment and eliminate the possibility of
injury.
Reference Only
Содержание Grove YB5515-2
Страница 1: ...Shuttlelift CD5515 2 Grove YB5515 2 Service Maintenance Manual R e f e r e n c e O n l y ...
Страница 2: ...This Page Blank R e f e r e n c e O n l y ...
Страница 12: ...TABLE OF CONTENTS CD5515 2 YB5515 2 SERVICE MANUAL TOC 8 This Page Blank R e f e r e n c e O n l y ...
Страница 292: ...R e f e r e n c e O n l y ...
Страница 293: ...R e f e r e n c e O n l y ...