![Manitowoc Grove YB5515-2 Скачать руководство пользователя страница 113](http://html.mh-extra.com/html/manitowoc/grove-yb5515-2/grove-yb5515-2_service-and-maintenance-manual_701236113.webp)
PREVENTATIVE MAINTENANCE
CD5515-2/YB5515-2 SERVICE MANUAL
5-12
Published 1-20-2017, Control# 483-02
SCHEDULED MAINTENANCE
Daily (Walk-around) Inspection
NOTE:
You must read and understand the warnings and
basic safety rules, found in Section 2 of this
manual, before performing any operation or
maintenance procedures.
For additional engine maintenance guidelines, see
the engine manual furnished with this crane.
Inspections
Inspect the Anti-Double Blocking System
Test the anti-double block system daily before beginning
operation to make sure it is functioning properly.
Raise the drop block until it hits the anti-double blocking
bracket under the boom head. An alarm should sound and
the raising of the hoist block should stop.
Lower the hoist block and the alarm will stop.
If there is a malfunction in the system,
DO NOT
operate the
crane. Have the malfunction corrected.
Inspect the Wire Rope
Each day before beginning operation, visually inspect the
wire rope for damage. See “50 Hours of Operation (Weekly)”
on page 5-17, for examples of damage that can be visually
inspected for. If any damage is found, do not operate the
crane. The wire rope must be replaced with a new rope
before operation can resume.
Inspect Reeving, Clamps and Connections
Each day before beginning operation, inspect for correct
reeving of the boom and drop block. Inspect the terminal
ends of the wire rope for damaged parts, loose clamps or
wrong installation.
DO NOT
operate the crane if any of the above are found.
Only after correcting the problem should the crane be put
back in service.
Inspect the Lifting Hook
Daily before beginning operation, inspect the lifting hook for
damage; cracks, deformation, loose retaining hardware, etc.
If any damage is found,
DO NOT
operate the crane until the
damage is repaired.
Inspect All Safety Devices
Daily before beginning operation, check all safety devices for
proper operation. Examples of safety devices include,
backup alarms, horn and beacon lights.
If any is found to be malfunctioning, correct the problem
before placing the crane in service.
Check Controls Operation
Each control should be checked for proper operation after
the above inspections have been completed. Do not place
the crane in service if any control is not functioning properly.
Component/System Checks
Check Fuel Level
Check the fuel supply daily before operation. Turn the
ignition key to the ON position and view the fuel gauge on the
i n s t r u m e n t p a n e l . I f n e c e s s a r y, f i l l t h e t a n k w i t h
recommended fuel.
Engine fuel is
flammable
and can cause a fire and/or
explosion. Avoid personal injury or death by keeping sparks,
open flames, and smoking materials away from the crane
and fuel during refueling or fuel system servicing. Know the
location of the fire extinguishers on the job site and how to
use them.
Maintain control of the hose nozzle when filling the fuel tank.
Do not allow fuel to spill. Clean up spilled fuel immediately.
Dispose of clean up materials properly.
WARNING
Loads may fall if the wedge and socket is not installed
properly or has damage. A falling load can injure or kill.
WARNING
Loads may fall if the lifting hook is damaged or loose. A
falling load can injure or kill.
w0015
Reference Only
Содержание Grove YB5515-2
Страница 1: ...Shuttlelift CD5515 2 Grove YB5515 2 Service Maintenance Manual R e f e r e n c e O n l y ...
Страница 2: ...This Page Blank R e f e r e n c e O n l y ...
Страница 12: ...TABLE OF CONTENTS CD5515 2 YB5515 2 SERVICE MANUAL TOC 8 This Page Blank R e f e r e n c e O n l y ...
Страница 292: ...R e f e r e n c e O n l y ...
Страница 293: ...R e f e r e n c e O n l y ...