![Manitowoc GROVE GMK5150L Скачать руководство пользователя страница 596](http://html.mh-extra.com/html/manitowoc/grove-gmk5150l/grove-gmk5150l_operating-manual_701194596.webp)
Crane operation
11.1 Before operating the crane
11 - 6
3 302 709 en
Operating manual
GMK5150L
1
2
.0
1.
201
8
Checking the posi-
tion of the hoist
ropes
•
Always check the entire length of the
winding of the ropes (
1
).
•
Slowly perform the
Lower
movement until
the rope has moved over a complete
width (
X
) of the rope drum.
– The rope must be evenly wound.
– The rope turns on the drum must be
evenly spaced, 0 to 2 mm (0 to 0.08 in)
apart.
– The cross-over points must be offset by
about 180°.
H
The top rope lines are laid over the next lower rope lines at the cross-over
points.
G
Risk of crushing due to turning rope drum
Keep away from the rope drum while it is turning.
This will prevent your limbs being drawn in or crushed.
Содержание GROVE GMK5150L
Страница 1: ...Operating manual 3 302 709 en 12 01 2018 ...
Страница 6: ...12 01 2018 2 3 302 706 en Additional page GMK Blank page ...
Страница 8: ...31 08 2018 2 3 302 808 en Additional pages GMK Blank page ...
Страница 12: ...22 11 2018 4 3 302 834 en us Correction sheet GMK5150 GMK5150L Blank page ...
Страница 14: ...28 11 2018 2 3 302 839 en Additional pages GMK Blank page ...
Страница 16: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 18: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 20: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 24: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 30: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 32: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 36: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 42: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 45: ...Operating manual 3 302 709 en GMK5150L 12 01 2018 15 15 Index ...
Страница 46: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 48: ...Overview 1 1 Accidents 1 2 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 50: ...Overview 1 4 Terms used 1 4 3 302 709 en Operating manual GMK5150L 12 01 2018 1 4 Terms used ...
Страница 52: ...Overview 1 4 Terms used 1 6 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 82: ...Overview 1 10 Identification 1 36 3 302 709 en Operating manual GMK5150L 12 01 2018 1 10 Identification ...
Страница 416: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 4 Operating manual GMK5150L ...
Страница 420: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 8 Operating manual GMK5150L Side panel ...
Страница 436: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 24 Operating manual GMK5150L ...
Страница 448: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 36 Operating manual GMK5150L Blank page ...
Страница 486: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 74 Operating manual GMK5150L Blank page ...
Страница 494: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 82 Operating manual GMK5150L Blank page ...
Страница 496: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 84 Operating manual GMK5150L Blank page ...
Страница 610: ...Crane operation 11 1 Before operating the crane 11 20 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 612: ...Crane operation 11 2 Standard slewing range type 11 22 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 680: ...Crane operation 11 5 Crane operation with main boom 11 90 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 738: ...Crane operation 11 7 Working range limiter 11 148 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 778: ...Rigging work 12 5 Starting the engine for rigging 12 30 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 802: ...Rigging work 12 8 Outrigger operation 12 54 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 818: ...Rigging work 12 8 Outrigger operation 12 70 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 896: ...Rigging work 12 10 Rigging work on the main boom 12 148 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 906: ...Rigging work 12 11 Other rigging work 12 158 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 1020: ...Index 15 2 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 1039: ......
Страница 1040: ......