![Manitowoc GROVE GMK5150L Скачать руководство пользователя страница 318](http://html.mh-extra.com/html/manitowoc/grove-gmk5150l/grove-gmk5150l_operating-manual_701194318.webp)
Driving modes and rigging for on-road driving
6.4 Rigging the main boom
6 - 36
3 302 709 en
Operating manual
GMK5150L
1
2
.0
1.
201
8
6.4.11
Aligning the connecting points
•
Hoist the main boom top in front of the
turntable. Make sure that:
– The hydraulic/electrical connection
lines (
3
) do not hang loose
– The pivot point (
1
) is higher than the
driver's cab,
– The connecting points are not tilted.
•
Lay the hoses into the turntable in such as
way that they are not damaged during
alignment.
•
Align the main boom so that the boom pivot
pin is aligned with the bearing points (
1
) in
the turntable.
•
Hold the main boom in this position until the
pivot pin is pushed in.
S
Risk of damage to the turntable and the connection lines
Make sure that the connection lines are located within the turntable and
that the main boom does not swing when you raise it for insertion into the
turntable.
Содержание GROVE GMK5150L
Страница 1: ...Operating manual 3 302 709 en 12 01 2018 ...
Страница 6: ...12 01 2018 2 3 302 706 en Additional page GMK Blank page ...
Страница 8: ...31 08 2018 2 3 302 808 en Additional pages GMK Blank page ...
Страница 12: ...22 11 2018 4 3 302 834 en us Correction sheet GMK5150 GMK5150L Blank page ...
Страница 14: ...28 11 2018 2 3 302 839 en Additional pages GMK Blank page ...
Страница 16: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 18: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 20: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 24: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 30: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 32: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 36: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 42: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 45: ...Operating manual 3 302 709 en GMK5150L 12 01 2018 15 15 Index ...
Страница 46: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 48: ...Overview 1 1 Accidents 1 2 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 50: ...Overview 1 4 Terms used 1 4 3 302 709 en Operating manual GMK5150L 12 01 2018 1 4 Terms used ...
Страница 52: ...Overview 1 4 Terms used 1 6 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 82: ...Overview 1 10 Identification 1 36 3 302 709 en Operating manual GMK5150L 12 01 2018 1 10 Identification ...
Страница 416: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 4 Operating manual GMK5150L ...
Страница 420: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 8 Operating manual GMK5150L Side panel ...
Страница 436: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 24 Operating manual GMK5150L ...
Страница 448: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 36 Operating manual GMK5150L Blank page ...
Страница 486: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 74 Operating manual GMK5150L Blank page ...
Страница 494: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 82 Operating manual GMK5150L Blank page ...
Страница 496: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 84 Operating manual GMK5150L Blank page ...
Страница 610: ...Crane operation 11 1 Before operating the crane 11 20 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 612: ...Crane operation 11 2 Standard slewing range type 11 22 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 680: ...Crane operation 11 5 Crane operation with main boom 11 90 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 738: ...Crane operation 11 7 Working range limiter 11 148 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 778: ...Rigging work 12 5 Starting the engine for rigging 12 30 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 802: ...Rigging work 12 8 Outrigger operation 12 54 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 818: ...Rigging work 12 8 Outrigger operation 12 70 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 896: ...Rigging work 12 10 Rigging work on the main boom 12 148 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 906: ...Rigging work 12 11 Other rigging work 12 158 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 1020: ...Index 15 2 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 1039: ......
Страница 1040: ......