Inspections after main boom mounting
•
Check to see if the pressure relief is switched off and is secured with the
lock;
•
Switch on the ignition.
•
Check if the
RCL
(
1
) or
CCS
(
2
) control unit
shows an error message.
•
If an error message is displayed, check that
all electrical connections are established;
The following requirements must be met for the subsequent inspection:
– The truck crane is on outriggers.
– The main boom is resting in the boom rest.
– The current rigging mode must have been entered and confirmed on the
RCL
display.
•
Telescope the telescopic section about 1 m out and back in.
•
Retract the telescoping cylinder into another telescopic section and
mechanically lock it there.
•
Check to see if the hydraulic connections in the turntable are sealed.
H
Before operating for the first time, carry out the movement
Incline lattice
extension
with the hydraulically derricking lattice extension and check if the
corresponding connections in the turntable are sealed.
Installing/removing the hose drum requires using an auxiliary crane
with sufficient load-bearing capacity. The weight of the hose drum is
about 170 kg (375 lbs).
Содержание GROVE GMK5150L
Страница 1: ...Operating manual 3 302 709 en 12 01 2018 ...
Страница 6: ...12 01 2018 2 3 302 706 en Additional page GMK Blank page ...
Страница 8: ...31 08 2018 2 3 302 808 en Additional pages GMK Blank page ...
Страница 12: ...22 11 2018 4 3 302 834 en us Correction sheet GMK5150 GMK5150L Blank page ...
Страница 14: ...28 11 2018 2 3 302 839 en Additional pages GMK Blank page ...
Страница 16: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 18: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 20: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 24: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 30: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 32: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 36: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 42: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 45: ...Operating manual 3 302 709 en GMK5150L 12 01 2018 15 15 Index ...
Страница 46: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 48: ...Overview 1 1 Accidents 1 2 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 50: ...Overview 1 4 Terms used 1 4 3 302 709 en Operating manual GMK5150L 12 01 2018 1 4 Terms used ...
Страница 52: ...Overview 1 4 Terms used 1 6 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 82: ...Overview 1 10 Identification 1 36 3 302 709 en Operating manual GMK5150L 12 01 2018 1 10 Identification ...
Страница 416: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 4 Operating manual GMK5150L ...
Страница 420: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 8 Operating manual GMK5150L Side panel ...
Страница 436: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 24 Operating manual GMK5150L ...
Страница 448: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 36 Operating manual GMK5150L Blank page ...
Страница 486: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 74 Operating manual GMK5150L Blank page ...
Страница 494: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 82 Operating manual GMK5150L Blank page ...
Страница 496: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 84 Operating manual GMK5150L Blank page ...
Страница 610: ...Crane operation 11 1 Before operating the crane 11 20 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 612: ...Crane operation 11 2 Standard slewing range type 11 22 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 680: ...Crane operation 11 5 Crane operation with main boom 11 90 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 738: ...Crane operation 11 7 Working range limiter 11 148 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 778: ...Rigging work 12 5 Starting the engine for rigging 12 30 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 802: ...Rigging work 12 8 Outrigger operation 12 54 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 818: ...Rigging work 12 8 Outrigger operation 12 70 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 896: ...Rigging work 12 10 Rigging work on the main boom 12 148 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 906: ...Rigging work 12 11 Other rigging work 12 158 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 1020: ...Index 15 2 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 1039: ......
Страница 1040: ......