1-6
nuts and screws removed in Step 5 to the tube assembly. Ensure the gasket is between the tube and
element assembly.
7.
Route the element leads through the element tube assembly and into the wire sleeving to prevent
chafing. Ensure that the wire sleeving is routed back through the Heyco bushing, keeping it clear
from the lift springs (see phots below and on the next page). Also ensure that the wire sleeving
extends into the tube assembly to protect the edge of the tube assembly from chafing the wires.
Press the pins into the connector in accordance with the diagram below, and then close the
connector to lock the leads in place.
NOTE:
It is critical that the wires be routed through the
sleeving to prevent chafing.
1
4
2
5
3
6
1
4
2
5
3
6
7
8
9
5
R
4R
6
R
1R
2
R
3R
Index Marker marks
Position 1
5L
4L
6L
1L
2L
3L
Full vat element wire routing
Pull the element wires through the
bushings on either side of the frypot
and down the back. Element wires
should be routed to the right of the
ATO temperature probe on the back
wall of the frypot.
Dual vat element wire routing
Pull the element wires through the
bushings on either side of the frypot
and down the back. Element wires
should be routed to the center of the
frypot between the ATO temperature
probes.
Содержание Frymaster FilterQuick FQE30
Страница 30: ...1 25 1 13 2 Bulk Wiring https appliancetechmanuals com ...
Страница 43: ...1 38 1 15 6 Menu Trees 1 15 6 1 FilterQuick Controller Setup Menu Tree https appliancetechmanuals com ...
Страница 44: ...1 39 1 15 6 2 FilterQuick Filter and Info Mode Menu Tree https appliancetechmanuals com ...
Страница 51: ...THIS PAGE INTENTIONALLY LEFT BLANK https appliancetechmanuals com ...