G
TURRET ROTATION
OPERATION OF THE EXTENSION ARM AND THE TELESCOPIC MAST
A
9
8
2 - 24
TO PLACE THE PLATFORM IN THE AXIS OF THE MACHINE
- Undo the lock nut (Ref.8, Fig. G).
- Open (unscrew) the valve (Ref.9, Fig. G)
- The turret rotation motor is then free.
- Manually rotate the turret to place it in the desired position.
When the operation has been completed, remember to screw up the valve again (Ref.9, Fig. G),
and do up the lock nut (Ref.8, Fig. G).
Содержание 105 VJR 2
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 7: ...1 1 1 INSTRUCTIONS 1 INSTRUCTIONS...
Страница 8: ......
Страница 19: ...2 1 2 DESCRIPTION 2 DESCRIPTION...
Страница 20: ......
Страница 21: ...2 3...
Страница 25: ...2 7 3 2 1 1 2 1 2 3 4 5 6 7 8 3 9 10 3 2 1 0 1 2 3 10 1 2 3 4 5 6 7 8 9 N O P Q 105 VJR 2...
Страница 26: ...2 8 80VJR 1 2 3 4 5 6 7 1 2 3 4 5 6 7 3 2 1 0 1 2 3 N O P Q...
Страница 27: ......
Страница 28: ...2 10 CONTROL INSTRUMENTS A GROUND CONTROL POINTS 13 HOURS 1 10 0 1 8 12 5 7 4 3 11 9 10 6 2 1...
Страница 30: ...2 12 CONTROL INSTRUMENTS B CONTROL POINT ON THE PLATFORM 17 18 15 14 19 24 24 20 16 22 21 23...
Страница 45: ...3 MAINTENANCE 3 MAINTENANCE 3 1...
Страница 46: ......
Страница 61: ...4 1 4 MAINTENANCE HANDBOOK 4 MAINTENANCE HANDBOOK...
Страница 62: ......
Страница 70: ......