SEDM - Smoke extraction damper - multi
Page 34
Version 2022-12-20
TPM 156/22
1
SEDM
2
Duct
3
Fixing profile with threaded rod
4
Connection´s insulation
5
L-holder
■
Brackets must be mounted on sides, location and symmetry is
not a specific requirement but is preferential.
■
The dampers and duct must be suspended separately.
■
Duct from BS EN 12101-7 in Steel (insulated or spray coated)
■
Number of L-holders and their placement, acc. to AxB dimen-
sion,
■
Examples of anchors to the fire dividing construction
■
Example of connection to duct
Suspension SEDM installed in horizontal duct MULTI
EIS 120