SEDM - Smoke extraction damper - multi
Page 28
Version 2022-12-20
TPM 156/22
Solid ceiling construction - Ablative Coated Batt - act. mechanism bellow
X
X
* Cover of actuating mechanism has to be removable after installation
■
Brackets must be mounted on sides, location and sym-
metry is not a specific requirement but is preferential.
■
Number of L-holders and their placement, acc. to AxB
dimension,
■
Examples of anchors to the fire dividing construction
■
For connection following duct
1
SEDM
2
Solid ceiling construction
3
Ablative Coated Batt (e.g. Firestop Board HILTI CFS-CT
B 1S 140/50 - min. density 140 kg/m
3
+ Firestop
acrylic sealant HILTI CFS-S ACR or equivalent)
4
Fire stop coating thickness 1 mm (e.g. HILTI CFS-CT,
PROMASTOP-CC or equivalent)
5
Fixing profile with threaded rod
6
Calcium silicate Actuator housing*
7
L-holder
EIS 120
Solid ceiling construction - Ablative Coated Batt - act. mechanism above
X
■
Brackets must be mounted on sides, location and sym-
metry is not a specific requirement but is preferential.
■
Number of L-holders and their placement, acc. to AxB
dimension,
■
Examples of anchors to the fire dividing construction
■
For connection following duct
X
1
SEDM
2
Solid ceiling construction
3
Ablative Coated Batt (e.g. Firestop Board HILTI CFS-
CT B 1S 140/50 - min. density 140 kg/m
3
+ Firestop
acrylic sealant HILTI CFS-S ACR or equivalent)
4
Fire stop coating thickness 1 mm (e.g. HILTI CFS-CT,
PROMASTOP-CC or equivalent)
5
Fixing profile HILTI MQ-41 (or MQ-41/3 or
equivalent)
6
Calcium silicate Actuator housing*
7
L-holder
EIS 120
Installation in solid ceiling construction of fire compartment
≥
1
5
0
* Cover of actuating mechanism has to be removable after installation
≥
1
5
0