Before commissioning the dampers and during their subsequent operational checks, it is necessary to
check and functionally test all the designs, including the operation of any electronic elements. Upon
commissioning, these operational checks must be completed at least twice a year. If no defect is found
during two consecutive operational checks, then operational checks may be completed once a year.
Prior to the commissioning of the dampers and subsequent operational checks, the following checks
must be completed with all the designs:
Visual inspection for proper damper installation, damper interior, damper blade, blade seating surfaces,
and silicone seal.
Removing the inspection opening cover: Unscrew the pan head screws (2 pcs) and tilt remove the cover.
AC 230V / 5A
IP 67
-25°C … +120°C
1(COM) - black wire
2(NC) -
gray wire
4(NO) -
blue wire
This limit switch is possible to connect in following two versions:
a)
if the arm is moving … connect wire 1+2
b)
if the arm is moving … connect wire 1+4