MANDÍK CPV Installation, commissioning, and maintenance
IZU 02/2021
MANDÍK, a.s., www.mandik.cz
R
20
7.2
INSPECTING THE UNIT PRIOR TO INITIAL START-UP
LIST OF SERVICING OPERATIONS PRIOR COMMISSIONING AIR-CONDITIONING UNIT MANDÍK
Order number:
User:
Date:
Commissioning party:
Project name:
Serial number:
Address:
Position:
Date of first start-up:
YES
NO
1.01.
1.02.
1.03.
1.04.
1.05.
1.06.
1.07.
1.08.
1.09.
1.10.
1.11.
1.12.
1.13.
1.14.
1.15.
1.16.
1.17.
1.18.
1.19.
Check the total tightness of the unit – visually
(the door, service panels, fixed panels, etc.).
Opera
tion
Description of servicing operation
Completion of operation
Check the cleanness of the chamber interior –
without foreign bodies and construction
Check closing of the unit – the door, service
panels.
Check the mounting of the roof on outdoor
units acc. to installation instructions.
Check the tightness of chamber connections –
visually, acc. to installation instructions.
OPERATIONS FOR THE UNIT IN GENERAL
Check the seating order of the chambers within
the unit acc. to the documentation.
Check each chamber for external or internal
damage.
Check connecting eccentric pieces between the
chambers – in the “tightened” position.
Check the seating of the unit – on the
floor/ceiling acc. to installation instructions.
Measured or set
value *
Comment
Check the connection of HVAC piping to the
damping inserts acc. to installation
Check the legibility and cleanness of
manufacturing and safety plates. Clean if