Commissioning and operation
68
Diagram of cooling system with expansion tank
2
1
3
4
6
8
5
7
À
Engine
Á
Bleeder line
∅
10 mm,
flow rate 7 l/min to max. 10 l/min
Â
Filler cap with
over- / underpressure
Ã
Expansion tank
Ä
Connection line to the intake side
of the coolant pump
∅
25 mm
Å
Coolant inlet
Æ
Coolant outlet
D
Valve: 0,6 / -0,08 bar
D
Observe the filling regulations of the manufacturer of the cogeneration power unit
D
For coolant filling quantity, see “Technical data”
Содержание E 2842 LE 302
Страница 1: ......
Страница 2: ......
Страница 3: ...49 Operating Instructions MAN Industrial Gas Engines...
Страница 4: ...50...
Страница 16: ...Commissioning and operation 62 Engine views E 2842 LE 302 1 2 3 4 5 1 6 8 9 10 11 7...
Страница 18: ...Commissioning and operation 64 Engine views E 2842 LE 312 1 2 3 4 1 8 9 10 7 5 6...
Страница 47: ...Notes 93...
Страница 49: ......
Страница 50: ......