Maintenance plan for operation with biological gas
for 60% CH
4
, 40% CO
2
−
E 2842 LE 312
87
Interval by hours
of operation
Maintenance service
Service
completed
of operation
at 1500 rpm
1)
E1
E2
E3
R1
R2
R3
completed
Stamp / signature
20
−
50
or after
commissioning
and R2, R3
x
400
x
2)
800
x
1200
x
1600
x
x
2000
x
2400
x
2800
x
3200
x
x
3600
x
4000
x
4400
x
4800
x
x
5200
x
5600
x
6000
x
6400
x
x
6800
x
7200
x
7600
x
8000
x
x
8400
x
8800
x
9200
x
9600
x
x
10000
x
10400
x
10800
x
11200
x
x
11600
x
12000
x
12400
x
1) The service intervals may depend on the operating conditions and the gas quality.
For the extent of work to be done see page 92.
2) After 400 hours of operation the cylinder head bolts must be retightened.
Содержание E 2842 LE 302
Страница 1: ......
Страница 2: ......
Страница 3: ...49 Operating Instructions MAN Industrial Gas Engines...
Страница 4: ...50...
Страница 16: ...Commissioning and operation 62 Engine views E 2842 LE 302 1 2 3 4 5 1 6 8 9 10 11 7...
Страница 18: ...Commissioning and operation 64 Engine views E 2842 LE 312 1 2 3 4 1 8 9 10 7 5 6...
Страница 47: ...Notes 93...
Страница 49: ......
Страница 50: ......