R
TRANSFORMER
24 VAC
75 VA
BLA
CK
SEE NO
TES
1, 8 & 11
YELLO
W
BLUE
#2
#1
CIRCUIT #1
COOLING ONLY (1ST STAGE)
WITH HOT GAS REHEAT
(DEHUMIDIFICATION)
CIRCUIT #2
1ST STAGE HEATING
2ND STAGE COOLING
#1
COMPRESSOR
#2
COMPRESSOR
T3
T3
T2
T2
T1
T1
T1
T1
T3
T3
T2
T2
L3
L3
L2
L2
L1
L1
1M
2M
SEE NO
TE 7
T1
T3
T2
L3
L2
L1
WT
3M
BLOWER
MOTOR
95
96
SEE NOTE 3
OL
1R
TD
2R
3
3
1
1
5
5
4
4
2
2
LP
LP
CS
CS
HP
HP
4R
3
2
4
3R
1
5
HV
LTC
RPB
ADT
3
3
1
1
5
5
2
2
4
4
RS
S3
S1
1
2
DM
6
6R
C1
C
C2
N.C.
3
1
(240 SECONDS)
SEE NOTE 10
M1
LINE
U-5 IOM
13
Ground
Compressor Contactor (Circuit #1)
Compressor Contactor (Circuit #2)
Blower Contactor
Lockout Relay (Circuit #1)
Lockout Relay (Circuit #2)
Lockout Signal Relay
Hot Gas Reheat Relay (Circuit #1)
Cooling Relay (Circuit #2)
Low Temperature Lockout Relay
Stage #2 Electric Preheat Relay (PE)
Hot-Gas Reheat Valve (Circuit #1)
4-Way Reversing Valve (Circuit #2)
HP
High Pressure Switch (400 psi)
LP
Low Pressure Switch (7 psi)
CS
Condensate Switch (Optional)
WT
Water Temperature Switch (Optional)
RS
Random Start Relay (25-60 Seconds)
TD
Time Delay Relay (25-60 Seconds)
DM
Damper Motor
OL
Overload (See Note 3)
AF
Airflow Sensor
DA
Discharge Air Sensor
HS
Humidistat (See Note 4)
MA
Mixed Air Sensor
OT
Outdoor Thermostat (See Note 4)
LTC
Low Temperature Cutout
ADT Adjustable Delay-on-Make Timer
1M
2M
3M
1R
2R
3R
4R
5R
6R
7R
HV
RV
Control Voltage Factory Wiring (24 VAC)
Control Voltage Field Wiring (24 VAC)
Line Voltage Factory Wiring
Line Voltage Field Wiring
LEGEND: