background image

Condensing Boiler

   

10

          19/11/03

Continue running for 15 minutes, venting every 5
minutes.

The Pilot is factory set.

The Main gas valve, GV2, gradually raises the
pressure to the set point. Allow at least 60 seconds
for the final pressure to stabilise.

IMPORTANT. It is essential when setting
the burner pressure that the inlet pressure
is at least 20 mbar (NG), 37 mbar (LPG)
with the boiler and any other connected
appliances running.

Set the burner pressure to the correct pressure by
using a manometer connected to the control and
adjusting the regulator to the desired input. (see the
charts below and Fig.1)

Where a bypass is fitted check its operation with the
system hot, the minimum flow rate through the
boiler should be as shown in the Technical Data on
Page1.

Set the pump speed to the highest setting that does
not provoke unreasonable operational noise within
the system.

Sealed Systems only:

  re-pressurise to required

pressure and set the gauge indicator

With the system hot, check again for water sound-
ness.  Refit the case to the boiler. Add remainder of
corrosion inhibitor. Balance the system in the
normal way to obtain even heating of all radiators.

If fitted set the cylinder thermostat to 60oC, or lower
if preferred.

Complete the  Logbook and pass to the user when
explaining and demonstrating the operation of the
system. Their instructions are located under the
Electrical Tray.

Rating Table

(1040 Btu/ft

³)

 (38.8 MJ/m

³

)

kW

Btu/h

sec/ft

³

m

³

/2 mins

10

34120

109.7

0.0309

12

40944

91.4

0.0371

14

47768

78.4

0.0433

16

54592

68.6

0.0495

18

61416

61.0

0.0557

20

68240

54.9

0.0619

22

75064

49.9

0.0680

24

81888

45.7

0.0742

26

88712

42.2

0.0804

Note: The boiler is fitted with a syphon
trap that includes a blocked drain device.
This is to safeguard the boiler and help
defer the effects from the possible freez-
ing of the condensate pipework in ex-
treme weather.

The user should be made aware of this
feature and, that in the event of blocked
condensate pipework, for example frozen
condensate pipework, the boiler will au-
tomatically stop functioning. It will start
again as soon as the blockage has
cleared.

For Commission check list see next page.

Содержание tentwenty

Страница 1: ...1 555 18 41 555 19 Serial Number 0087 tentwenty twentytwentysix Condensing Boilers Installation Service Instructions Note to the Installer Natural and Propane Gas Please leave these Instructions adjac...

Страница 2: ...P 20 kg 28 kg 1 4 litres 3 bar 1 m 30 82 C 10 12 litres m 5 litres m 22mm Copper 230V 50Hz 40W 1 Amp 20mm 3 Amp 790 High 400 Wide 330 Deep 450 Front 30 Above 25 Below 30 Left Right Concentric 160 High...

Страница 3: ...s may require the addition of a bypass an automatic bypass is preferred The boilers also contain integral frost protection the boiler will fire if the temperature within it approaches 4 to 5 degrees C...

Страница 4: ...he purpose Details of essential features of cupboard compartment design including airing cupboard installations are given in BS 6798 In siting the boiler the following limitations MUST be observed 1 T...

Страница 5: ...ter system if applicable should be in accordance with the relevant recommenda tions of BS 5546 Copper tubing to BS 2871 1 is recommended for water carrying pipework The hot water storage cylinder MUST...

Страница 6: ...The boiler is supplied for 230V 50Hz Single phase Fuse rating is 3A The method of connection to the mains electricity supply MUST facilitate complete electrical isolation of the boiler preferably by t...

Страница 7: ...cut off during installation Right or Left Outlet 1 Secure the 50mm flue tube with ELBOW connec tor on the saddle using the Velcro strap See Fig 7 2 Measure carefully and saw off the 50mm tube to give...

Страница 8: ...and Side Trim 3 With the bottom of the boiler away from the wall hang the top of the back panel onto the Mounting Box Now by gently lowering the bottom of the boiler against the wall the fan spigot sh...

Страница 9: ...minimum flow conditions An automatic bypass is preferred The boiler waterside is completely copper so all good corrosion inhibitors are suitable Designs The following designs are all acceptable 1 Seal...

Страница 10: ...pletely normal It is recommended that the gas cock is turned off during this early stage Because of a built in delay the boiler is always held off for a minimum of 120 seconds However for commissionin...

Страница 11: ...em hot check again for water sound ness Refit the case to the boiler Add remainder of corrosion inhibitor Balance the system in the normal way to obtain even heating of all radiators If fitted set the...

Страница 12: ...fill system adding 3 4 of the inhibitor Do not light boiler Vent all radiator and air release points Run pump for 5 10 second bursts and revent Condensing Boiler 11 06 06 01 Do not light boiler Run pu...

Страница 13: ...ngths Minimum 200mm Maximum 22m horizontal 90mm 90 bend 4 0m 45 bend 1 3m Suggested core drill Suggested core drill 128mm Flue 100 to 2000mm Left right or rear Flue Air Concentric Flues Service Access...

Страница 14: ...NSOR 12 Way connector GV1 GV2 N 4 Core to Gas Valve Fan 4 way Molex 10 way Molex GV1 GV2 1 Amp 20mm CONTROL BOARD Or Or Br Br R W Bk Gy Br R Bk Br G G Y G Y G Y B G Y V Gy Br R Or W Bk Gy V G Y B Brow...

Страница 15: ...Condensing Boiler 14 06 06 01 Physical Wiring Diagram Fig 4...

Страница 16: ...Wall Fixing Holes 2 Lower Wall Fixing Holes Core Drill 128mm 118 Use 2 at the top and any other 2 below 236 288 167 92 32 17 kW For Concentric 270 For Twin Pipe Core Drill 90 mm Condensing Boiler 15...

Страница 17: ...1 Boiler Panel Assembly Control Board Chassis Electrical Cover Top Trim Front Burner Baffle Side Trim Fig 6 Pressure Cover Concentric Flue Boiler Mounting Box Fan Protection Hoop Lower Burner Baffle T...

Страница 18: ...e Positions Fig 7 Fig 8 Flue Duct Air Duct 100mm Condensate Drain Connection connects to drain point on Flue Spigot Adapter Flue Spigot Adapter Drain Point Twin Pipe Boiler Mounting Box Assembly Conne...

Страница 19: ...me is detected and the control board stops sparking and then energises the main gas valve and the burner lamp is illuminated The pilot flame lights the burner and it stays alight until turned off by t...

Страница 20: ...Condensing Boiler 19 03 07 03 Fault Diagnosis...

Страница 21: ...quired If in doubt drain the system and remove for inspection 2 Condensate Syphon With a suitable bowl to catch the water un screw the drain cap s on the underside of the Syphon trap and drain the wat...

Страница 22: ...NCE CASE COULD RESULT IN LEAKAGE OF COMBUSTION PRODUCTS INTO THE ROOM 3 Fan Assembly Lower the Electrical Tray Remove the Case Undo the wing nut holding the Fan Protec tion Hoop Pull the electrical co...

Страница 23: ...ove the Case Pull off the HT lead from the Control board Undo the left and right screws holding the Front Burner Baffle Remove the front baffle Release the tube nut holding the electrode to the Pilot...

Страница 24: ...04 Fan Assembly 17 kW M1095 Fan Assembly 24 kW M0910 106 435 Control Board M3752 Control Assembly M3915 Gas Valve Sigma 840 M3783 Air Pressure Switch Concentric Flues 7712 379 091 Air Pressure Switch...

Страница 25: ...ces Flue Thermostat Fan Assembly Secondary Heat Exchanger Fibre Washer 2 Places Flow Pipe Control Sensor O H Stat Primary Heat Exchanger Gas Manifold HT Lead Pilot Assembly Main Injector Electrode Pil...

Страница 26: ...Trap Air Gap Air Gap 110mm Soil Pipe or Drain Soakaway Insulate against freezing 150mm Land Drain Filled with Gravel 750mm deep Condensate Drain from Boiler Air Pressure Switch pipe connection Vent Sy...

Страница 27: ...e specification without notice Your statutory rights are not affected Malvern Boilers Ltd Enigma Business Park Spring Lane Malvern WORCS WR14 1BW Telephone 01684 893777 Fax 01684 893776 www malvernboi...

Отзывы: