
WDS
Operation, Maintenance and Installation Manual
Issue 11
Page
13
14/02/2019
3.0 Loading and Operation
3.1 Urinal Bottle / Bedpan – Loading
Refer to laminated WDS Instructions
1. To open door, use or press
2. Place racks into the correct positions
3. Place bedpan lids into back of bowl rack
4. Place first bedpan onto top rack, or large/small slipper pan
5. Place second bedpan onto bottom rack or large/ small slipper pan
6. Place urinal bottles into rack
Lift bedpan rack up and lock
into position.
Check that bowl
rack is in the up
position
.
Содержание WDS Series
Страница 43: ...WDS Operation Maintenance and Installation Manual Issue 11 Page 42 14 02 2019 6 3 Wiring Diagram 1ph devices...
Страница 44: ...WDS Operation Maintenance and Installation Manual Issue 11 Page 43 14 02 2019 6 4 Wiring Diagram 3ph devices...
Страница 54: ...Manufactured by Malmet Australia ABN 95 001 717 791 www malmet com au Part No 92 2226...