12.SHIPPING AND HANDLING 

 

A) 

PLACING THE BOILER ON VEHICLE

 

 

When the boiler is placed on vehicle, loading must be done with a 
crane. Gates of the vehicle body must be opened previously. 
Please use supporting ring while loading boiler with crane.  

         Pass the crane boom hook from the supporting ring.  

Make sure that hook pim is in safety mode. Uphold the crane boom and 
take the space. Slowly uphold the boiler that  bottom level should be 30-
40cm up from the ground. 
Avoid sudden moves that would cause boiler to shake. Move the boiler next  
to vehicle in this way. After the boiler is placed next to vehicle,lift the boiler 
from 30-40cm higher than the vehicle body and and take it down on vehicle 
body correctly.  

 

ATTENTION

 : Boiler must be carried in vertical position by  using the 

supporting ring. When the boiler is lifted up with crane, make sure there are no 
living beings left under the boiler. Boiler must be carried with its accessories 
installed on it. 

 

B) 

CARRYING BOILER ON VEHICLE 

 

When the boiler is carried with vehicle, it must be tied to vehicle strictly, supporting 
items should be placed around to avoid slipping. Boiler should not transported with 
fragile, smashable items and living beings. Top of the vehicle must be covered with 
canvas after placing boiler. Driver must  keep away from the sudden moves that 
would cause danger. 
 

C) UNLOADING OF THE BOILER TO THE PLACE OF USE

 

Boiler should not be placed in work or residential areas, it must be placed in a seperate 
boiler room. 
When unloading the boiler to boiler room, crane must be used again, points that stated 
in Clause A, must be considered. 
If the place of use is not appropriate for crane entrance, boiler must be unloaded in a 
proper place and carried with rollers to the intended place 

                                 

                    

 

                              

 

 

Содержание 25MKP

Страница 1: ...1...

Страница 2: ...4 3 VENTILATION Page 12 4 4 CHIMNEY Page 12 4 5 CHIMNEY CONNECTION SCHEMA Page 13 5 TECNICAL SPECIFICATION TABLE Page 14 6 CONTROL PANEL Page 15 6 1 ERROR CODES Page 15 6 2 LCD SCREEN SYMBOLS Page 16...

Страница 3: ...and continues its way in line with these principles This handbook is a helpful guide to the user for installing operating and maintaining the boiler For product breakdown and maintenance please contac...

Страница 4: ...perating Danger of personal injury as result of the flame coming out of the combustion chamber Do not remove the outer cover sheets of the boiler do not open the protective covers Risk of burning as a...

Страница 5: ...t is strictly forbidden to install boilers in enclosed spaces where people live Do not operate boilers without water Never supply cold water to a hot boiler If the boiler temperature has risen above 9...

Страница 6: ...ty to monitor loading and standby times from the electronic control panel by adjusting from the digital display The erosion caused by heating has been minimized with the chromium combustion chamber Ex...

Страница 7: ...7 3 APPEARANCE OF THE BOILER AND EXTERNAL DIMENSIONS...

Страница 8: ...ne with Reductor 7 Bunker 8 Fuel Loading Trap 9 Fuel Level Sensor 10 Chimney Temperature Sensor 11 Smoke Pipe Cleaning Mechanism Handle 12 Chimney Outlet 13 Circulation Inlet Connection 1 14 Fuel Load...

Страница 9: ...leaned before the initial operation of the boiler The best way is to flood water from one side of the pipes and drain it from the other side The circulation pump should be mounted on the return pipe o...

Страница 10: ...pipe used in installation at minimum lAn uninterruptible power supply may be used for electricity cut as an extra security measure lMount 3 bar security valve on the boiler for safety against over pre...

Страница 11: ...11 4 2 BOILER INSTALLATION MOUNTING SCHEMA 1 1...

Страница 12: ...n 2 meters and pipe must be connected to the chimney with minimum 10 degree of angle lWe suggest not to use enamel stove pipes as they cause tars in chimney connection pipe or chimney system lIn case...

Страница 13: ...outside the isolation must be done properly lThe chimney must be frequently cleaned in order to avoid tar soot and clogs that would prevent chimney draught lThere shouldn t be foreign objects cement...

Страница 14: ...245 Working Pressure bar 3 Test Pressure bar 4 5 Circulation Inlet Outlet 1 Security Inlet 1 Security Outlet 1 Filling Draining 1 2 Boiler Setting Range Min Max C 35 90 Boiler Water Volume lt 46 Fuel...

Страница 15: ...with up and down buttons Fuel Waiting Time sec If the factory settings do not suffice press the button once to change the fuel waiting values and adjust with up and down buttons Up Button Enter the m...

Страница 16: ...16 When no setting is done the value shown at the screen is the boiler water temperature...

Страница 17: ...D SREEN SYMBOLS Fan is Activated Reductor Engine is Activated Circulation Pump is Activated Error Symbol Burning Symbol Automatic Ignition Rezistance is Activated Heating Circuit is Working Fan Operat...

Страница 18: ...the ignition the temperature and auto setting indications will flash interchangeably on the LCD screen When the combustion occurs the burning symbol appears on the screen and the boiler continues to r...

Страница 19: ...19 USING SETTING RECOMMENDED BY THE FACTORY FAN LEVEL 3 LOADING 9 sec WAITING 29 sec...

Страница 20: ...me it prevents the circulation of unheated water to the radiators The boiler water temperature continuously decreases when the fuel is exhausted and the circulation pump is deactivated when it reaches...

Страница 21: ...21 1 Never open the boiler doors 2 Open the bypass valves in the system if available 3 When power is back reset all settings...

Страница 22: ...re prevented The air vents in the combustion chamber and the combustion chamber are automatically cleaned with the fan If any deterioration observes in the combustion combustion chamber can be cleaned...

Страница 23: ...tting possibilities and set the desired DHW temperature from the operating panel In this case you will avoid overheating of the water and unnecessary fuel consumption Consume hot water under control L...

Страница 24: ...onic card may have failed Call authorized service H4 Boiler is Overheated Electronic card sensor Boiler water may be missing Stop burning and do not flood water to boiler until it cools down Flood 1 5...

Страница 25: ...boiler is open or not completely closed Temperature rises above 200 C Check that the front door of the boiler is closed User settings are set too high Rises above 200 C Return back to factory setting...

Страница 26: ...eak Clean the chimney and check the draught Smoke Comes From Chimney Connections Boiler chimney connections may be loosen Check the boiler chimney outlet and pipe connections Chimney draught is weak C...

Страница 27: ...e supporting ring When the boiler is lifted up with crane make sure there are no living beings left under the boiler Boiler must be carried with its accessories installed on it B CARRYING BOILER ON VE...

Страница 28: ...28...