27 / 71
Fig. 59
4
Put the lead wires [4] of Switch unit in the space
indicated by (a).
5
Fix the lead wires [4] of Switch unit in the lead wire
holders indicated by (b).
6
The slack portion of the lead wires [4] of Switch unit
should be put in the space indicated by (c).
7
Put Connector [5] in the space indicated by (d).
8
Fix the lead wires [6] of Lead unit in the lead wire
holders indicated by (e).
9
Put Control cable [7] in the space indicated by (f).
10
Put Corrugated tube [8] in the space indicated by (g).
11
Fasten Arm cover [9] by tightening six 4x18 Tapping
screws in numerical sequence as shown below left.
Tips
Refer to 6 CIRCUIT DIAGRAM and 7 WIRING
DIAGRAM for wiring of the lead wires.
1
2
5
6
4
3
[4]
[6]
[7]
[8]
[9]
[5]
[a]
[b]
[c]
[d]
[e]
[f]
[g]