www.major-equipment.com
11
P.T.O. Maintenance
The machine must always be disconnected form the tractor before any cleaning, lubricating and servicing operations
can be carried out. Maintenance must be carried out by quali
fi
ed personnel
If emergency operations are required whilst the machine is connected to the tractor, switch off the engine, engage the
parking brake and disengage the PTO.
Good, regular maintenance and correct use are if the topper is to remain safe and long lasting.
PTO Shaft Maintenance
Guard Removal and Yoke End Greasing
1.
Prise back locking tabs
2.
Pull back PTO Guard
3.
Grease points as shown
4.
Push Guard into position
5.
Click into place
6.
Tie check chain
PTO Guard Greasing Intervals
INITIALLY
8 HOURS
16 HOURS
PTO Shafts
●
●
Hydraulic Ram Pivot Points
●
●
Roller Height Adjusters
●
●
Carry Arm Pivot Points
●
●
A-Frame Linkage
●
●
Machine Maintenance
Shearbolt Replacement
1. Slide yoke shield back.
2. Drive out sheared bolt with hammer and punch.
3. Align holes and install new shear bolt.
4. Slide yoke shield securely in place
IMPORTANT
Fit PTO shaft with the shearbolt end connected to the machine as directed
on the PTO guarding
Use only genuine MAJOR replacement shear bolts.
Grease the follwoing at the shown intervals
Check tightness of the nuts on the Pivot connection daily.
Содержание Verge
Страница 18: ...www major equipment com 14 Verge Major 1400 Spare Parts...
Страница 20: ...www major equipment com 16 Verge Major 2000...
Страница 22: ...www major equipment com 18 Verge Major 2650...