www.major-equipment.com
22
250320
USD-GA1
Lubrication schedule
Use EP2 type grease or equivalent.
Use oil which conforms to 85W/140 standards.
Grease points Initially 25 hours 40 hours 80 hours 150 hours 400 hours
All PTO Shaft Yoke Ends
●
●
PTO tubes
●
●
Wing eye pivot
0/2/4
●
●
Spinning undersole disk
0/3
●
●
Hydraulic Ram
0/1/2
●
●
Roller stub axles
2/4/6
●
●
Castor wheel pivot
0/2/4/6
●
Castor wheel axle
0/2/4/6
●
Check oil levels in the gearboxes
●
Replace oil in gearboxes
●
Spinning Undersole Disk
(if applicable)
The Disk should be able spin freely. Slight side-to-side rocking motion is
allowed. In order to adjust the disk please do the following:
•
Remove the assembled Spinning Undersole Disk (USD-GA1) from the
machine;
• Remove seal (Item 7);
• Tighten up the lock nut (Item 8) if required;
• Place the seal back in position;
•
Bolt the assembled unit (USD-GA1) back to the machine.
Содержание CYCLONE MJ31-200
Страница 80: ...MJ40T11 347 805 1 www major equipment com 11...