www.major-equipment.com
13
220519
Operating the Machine
Attaching machine to the Tractor
ALWAYS OPERATE ON LEVEL GROUND WHEN HITCHING/UNHITCHING THE IMPLEMENT. THIS WILL
PREVENT DANGEROUS MOVEMENT. NEVER ALLOW ANYONE TO STAND BETWEEN THE
TRACTOR AND THE MACHINE.
Three Point Linkage Models
1. Adjust both lift arms of the tractor until they are level in relation to each other.
2. Hitch the lower linkage arms to the Machine and connect the top link and PTO shaft. Ensure that the locking pins
are secure.
3. With the Machine lowered in its operating position, adjust the top link until the strap is slack, allowing the Machine
to produce a uniform finish in varying ground conditions.
4. Check the PTO shaft for length as described previously. Connect the PTO shaft. Ensure PTO check chains are
anchored to prevent PTO guarding from rotating.
5. Connect the hydraulic hoses to the appropriate connections (selected models only).
Trailed Models
1.
Adjust the tractor hitch pin so that the hitch pin is approximately 400 mm (16”) from the end of the tractor PTO
shaft.
2. Adjust the machine hitch eye to suit the tractor drawbar height paying particular attention to keep both height
adjusting bolts as far as possible on the adjusting bracket. Careful adjustment of the hitch eye height at this stage
is necessary in order to allow the machine to function safely and correctly.
3. Connect the machine to the tractor. Ensure no one is standing between the tractor and the Machine.
4. Check the PTO shaft for length as described previously. Connect the PTO shaft. Ensure PTO check chains are
anchored to prevent PTO guarding from rotating.
5. Connect the hydraulic hoses to the appropriate connections (selected models only).
Содержание CYCLONE MJ31-200
Страница 80: ...MJ40T11 347 805 1 www major equipment com 11...