Majestic Fireplaces

®

 SR/SC Series

Continue installing the pipe as required until pipe is
installed up through the ceiling.  At this point, you must
install a firestop spacer.

Installing the Firestop Spacer

 in the Ceiling Hole

A firestop spacer is used to keep pipe spaced properly
and required for safety.

Nail the firestop spacer (at each corner) to the framing
members of the ceiling hole. Note:  A firestop spacer is
not required at the roof.

Hole sizes listed in Figure 13 for angled firestop
spacers provide minimum required air space to chim-
ney pipe for ceiling thickness up to eight (8) inches.
When combined thickness of ceiling material, ceiling
joists and flooring material exceeds eight (8) inches,
adjustments must be made in framing to assure that
minimum air spaces to chimney are maintained.

Proper Firestop Spacer Installation

Figure 18 shows different installation procedures for
both an area that 

is an attic and  an area that is not an

attic.

If the area above the ceiling is not an attic, position the
firestop spacer with the flange on the ceiling side and
the angled portion extending up into the hole.

If the area above the ceiling is an attic, position the
firestop spacer with the flange on the top of the framed
hole and the angled portion extending down into the
hole.

Firestop spacers are not available for nor are they
required on vertical walls.

DO NOT put any sealant around the area where the
outer pipe slides through the firestop spacer.  If you
seal this area, it may cause a fire hazard.

Canadian Requirements

for Insulation Shield

In Canada, an attic
insulation shield is
required to prevent attic
insulation from contact-
ing the chimney sec-
tion.  Framing dimen-
sions for the chimney
hole should measure
14

¹⁄₂

" x 14

¹⁄₂

".  An attic

shield MUST be in-
stalled on top of attic
joists (above the floor
level).  (Fig. 19)

Fig. 18  Installing firestop spacer.

FP593

FP558

Fig. 16  Install pipe, listening for the snap-lock to fasten.

UP

LANCE

HEM

PIPE RIM

PIPE 
  RIM

PIPE SECTION

JOIST

NAILS (4)

FIRESTOP

SPACER

JOIST

NAILS (4)

FIRESTOP

SPACER

Ceiling Installation

Attic Installation

ELBOW STRAP

ANGLED STRAP

Fig. 17  Attach straps to a structural framing member.

FP270/271

SUPPORT 
STRUCTURE

ELBOW 
STRAP
(must be tight)

CHIMNEY 
SUPPORT 
STRAP
(must be tight)

CEILING 
HOLE
FRAMING 

ANGLE 
FIRESTOP

Содержание SC36

Страница 1: ...678901234567890123 12345678901234567890123 12345678901234567890123 12345678901234567890123 12345678901234567890123 12345678901234567890123 12345678901234567890123 12345678901234567890123 1234567890123...

Страница 2: ...ings Majestic Products Chimney Top installation instructions Installation other than as instructed by Vermont Castings Majestic Products or Installation and or use of any component part not manufactur...

Страница 3: ...97mm 7 191mm 7 191mm Outside Air Gas Line Access Gas Line Access Electrical Access Recessed Nailing Flange 11 DIA Rough Opening Width 41 Rough Opening Height Rough Opening Depth 3 4 8 7 6 m m 1041mm 1...

Страница 4: ...epth 50 1270mm 50 1270mm 3 6 9 1 4 m m 7 0 1 7 9 1 m m 8 210mm 22 559mm 22 572mm 26 667mm 40 1035mm 14 372mm 15 397mm 9 241mm 3 76mm 8 203mm 7 191mm Outside Air Gas Line Access Electrical Access 1194m...

Страница 5: ...Fireplace and chase parts identification TERMINATION CAP STORM COLLAR PAN FLASHING DRAFTSTOP FIRESTOP STANDOFF NAILING FLANGE GAS LINE ACCESS both sides ELECTRICAL ACCESS OUTSIDE AIR COVER PLATE DAMPE...

Страница 6: ...exit SR SC36 SR SC42 Maximum 90 90 Minimum Without Elbows 12 6 12 6 With 2 Elbows 14 6 14 6 With 4 Elbows 21 0 21 0 B Do not use more than 4 elbows per chimney Attach the straps of the return top elbo...

Страница 7: ...of the chimney to the peak of the roof is 10 feet or less the top of the chimney must be at least 2 feet above the peak of the roof but never less than 3 feet in height above the highest point where i...

Страница 8: ...A FIRE PLACE IN AN INSULATED ENCLOSURE BE SURE ALL REQUIRED AIR SPACES ARE MAINTAINED Fig 20 Page 14 Installation Chimney Supports The chimney system is supported by the fireplace for vertical chimney...

Страница 9: ...Remove knockout in the center of the back of the EB1 and install listed cable clamps Feed electrical wire through listed cable clamp leaving approximately six 6 inches of wire exposed through the EB1...

Страница 10: ...pass through ceiling Locate center point of the chimney on ceiling as though a straight up chimney arrangement is to be used Measure your offset dimension from straight up chimney center point on ceil...

Страница 11: ...t by attaching the first chimney section to the collar on top of the fireplace Install the pipe as pictured in Figure 16 When you get a good lock you will hear the pipe clearly snap together Once sect...

Страница 12: ...lange on the ceiling side and the angled portion extending up into the hole If the area above the ceiling is an attic position the firestop spacer with the flange on the top of the framed hole and the...

Страница 13: ...point of the flue system Drive a nail up through roof at the center point This will determine center point on outside of the roof Cut and Frame Roof Hole Size of roof hole varies with the type of chi...

Страница 14: ...Fig 20 8 Finish Wall Finish the wall with material of your choice Do not install a combustible mantel shelf less than 12 inches above the grille opening If a combustible material is used below a flat...

Страница 15: ...cified for the SP40 Rt must 1 85 minimum Examples of wall shield insulation 1 Manville CERAFORM 126 K 27 1 2 inches thick 2 Majestic EH2416 K 458 1 inch thick required FP531 See mantel drawing for she...

Страница 16: ...rial Factors are related by the formula K 1 R T given thickness R thermal resistance for a given thickness T K thermal conductivity Noncombustible material with a lower R value may be used provided th...

Страница 17: ...new material per inch K of listed material per inch thickness of listed material x Example for Common Brick T new 5 0 0 458 x 0 50 in 5 46 in new required thickness Fig 24 Hearth extension material f...

Страница 18: ...ace side NOTE When installing an ANSI Z21 11 2 ventless appliance the finishing material used for the mantel must be rated at 250 F or greater BTU input of a gas appliance installed in fireplace shoul...

Страница 19: ...2 3030172 8 Screen Clips 7512135 7512135 9 Hearth Pan Cover Plate SC Only 3031104 3031104 10 Outer Collar Assembly SK8 Chimney 3030143 3030143 11 Nailing Flange 2253161 2253161 12 Top Grille Assembly...

Страница 20: ...h action may void the coverage provided by the owner s insurance Glass Door Standard Bi Fold door set Brushed Brass finish 36GDKBB SR C36 42GDKBB SR C42 Black finish 36GDKBK SR C36 42GDKBK SR C42 Poli...

Страница 21: ...ney through CT100 a chase top Appropriate adapter required Flashing not included Adapter Kit Unites Square Chase Termination with chimney CTSK pipe required Chase Top Housing Low profile pyramid style...

Страница 22: ...Shield Used to prevent insulation from coming in AIS SK contact with the chimney system SK8 Chimney Sections Used to build chimney systems exposed above SK818CAN 1 Long roof SK84CAN 4 Long 45 Chimney...

Страница 23: ...t at a cost to the consumer of Vermont Castings Majestic Products then current list price FOB Vermont Castings Majestic Products factory or pay to the consumer the then current wholesale price of such...

Страница 24: ...c Fireplaces SR SC Series Vermont Castings Majestic Products 410 Admiral Blvd Mississauga Ontario Canada L5T 2N6 905 670 7777 www majesticproducts com www vermontcastings com Vermont Castings Majestic...

Отзывы: