16
Vermont Castings Majestic Products DV360/580 Series
20002261
X
X
FP1181
Fig. 31 Vertical height requirements.
1
2
3
4
1
2
3
4
1 + 2 + 3 + 4 = 270
°
FP1180
Fig. 28 Maximum elbow usage.
Vertical Sidewall Installation
Step 1
Locate vent opening on the wall. It may be necessary
to first position the fireplace and measure to obtain
hole location. Depending on whether the wall is com-
bustible or noncombustible, cut opening to size. (Fig.
29) (For combustible walls first frame in opening.)
Combustible Walls: Cut a 9
³⁄₈
”H x 9
³⁄₈
”W (240mm x
240mm) hole through the exterior wall and frame as
shown. (Fig. 29)
Noncombustible Walls: Hole opening must be 7
¹⁄₂
”
(191mm) in diameter.
Step 2
Measure wall thickness and cut zero clearance sleeve
parts to proper length (MAXIMUM 12” / 305mm).
Assemble sleeve and attach to firestop with #8 sheet
metal screws (supplied). Install firestop assembly. (Fig.
30)
#8 Screws
(2)
Adjustable Zero Clearance Sleeve
Firestop
#8 Screws (2)
#8 Screws (2)
Adjustable Zero
Clearance Sleeve
Max. Length 12"
(305mm)
Fig. 30 Adjustable zero clearance sleeve.
ZCS101
Zero clearance sleeve is only required
for combustible walls.
Fig. 29 Locate vent opening on wall.
9
³⁄₈
"
(240mm)
Vent Opening for Combustible Wall
Fireplace Hearth
Framing Detail
7
¹⁄₂
" Dia.
(190mm)
Vent Opening Noncombustible Wall
9
³⁄₈
"
(240mm)
Fireplace Hearth
VO584-100
Step 3
Place fireplace into position. Measure the vertical
height (X) required from the base of the flue collars to
the center of the wall opening. (Fig. 31)
Step 4
Apply a band of silicone to the inner and outer flue
collars of the fireplace and using appropriate length of
pipe section(s) attach to fireplace with three (3) screws.
Follow with the installation of the inner and outer
elbow, again secure joints with three (3) sheet metal
screws. Wipe off any excess high temperature sealant.
f i r e - p a r t s . c o m
Содержание DV360
Страница 42: ...fire parts com...