62D4037
7
FIREPLACE FRAMING
Firebox framing can be built before or after the appliance is set in place. Construct firebox framing fol-
lowing Figure 2 and the chart below for your specific installation requirements. Refer to Page 8, Figure
3 for firebox dimensions. The framing headers may rest on the top of the firebox standoffs.
The firebox may be installed directly on a combustible floor or raised on a platform of an appropriate
height. When the firebox is installed directly on carpeting, tile or other combustible material, other than
wood flooring, the firebox shall be installed on a metal or wood panel extending the full width and depth
of the enclosure.
PRE-INSTALLATION INFORMATION
Do not fill spaces around firebox with
insulation or other materials. This
could cause a fire.
W
ARNING
B
A
H
G
D
F
E
A
C
1
/
2
" or
5
/
8
"
C
A
G
C
G
A
������
��������������������
�����
Corner Installation
Inside Chase Installation
Stud Location
Recessed Installation
Figure 2 -
Framing Dimensions
400BBV
400SBV
500SBV
A
40
¹⁄₂
”
40
¹⁄₂
”
46
¹⁄₂
”
B
40
¹⁄₄
”
40
¹⁄₄
”
40
¹⁄₄
”
C
31
³⁄₈
”
24
¹³⁄₁₆
”
30
¹³⁄₁₆
”
D
16
¹⁄₈
”
13
¹⁄₂
”
16
¹⁄₂
”
E
61
¹⁄₄
”
67
⁷⁄₈
”
73
⁷⁄₈
”
F
30
⁵⁄₈
”
34”
37”
G
14
¹⁄₂
”
21
¹⁄₂
”
21
¹⁄₂
”
H
43
³⁄₈
”
48”
52
¹⁄₄
”
Содержание 400BBV
Страница 30: ...62D4037 30 ILLUSTRATED PARTS LIST FIREBOX COMPONENTS 4a 4b 4c 1 2 3 5 6 7...
Страница 32: ...62D4037 32 ILLUSTRATED PARTS LIST STANDING PILOT MILLIVOLT CONTROL 1 2 3 4 5 6 7 8 10 12 13 2T 2I 2C 9 11...
Страница 34: ...62D4037 34 ILLUSTRATED PARTS LIST ELECTRONIC IGNITION 1 2 3 4 5 6 7 9 8 10 11 12...
Страница 41: ...62D4037 41 NOTES...
Страница 42: ...62D4037 42 NOTES...
Страница 44: ...MHSC 149 Cleveland Drive Paris Kentucky 40361 www mhsc com OCTOBER 2008 62D4037 Rev 10...