background image

26D4751

In planning the installation for the appliance it is necessary to determine where the unit is to be installed and whether optional 

accessories are desired. Gas supply piping should also be planned. The following steps represent the normal sequence of 

installation.  Each installation is unique, however, and might require a different sequence.

1.   Position firebox prior to framing or into prepared framing.
2.   Plumb gas line. (Gas connections should only be performed by an experienced, licensed/certified tradesman).

3.   Install vent-free gas log heater per the instructions provided with the vent-free gas log heater.

4.   Complete finish wall material, surround and optional hearth extension to your individual taste.

GENERAL INSTALLATION INFORMATION 

Figure 1 - Firebox Dimensions

   

32LCUFF

 

36LCUFC-R

 

7"

 

1"

 B 

"

 

6"

 C 

16"

 

18"

 D 

28⅞"

 

"

 E 

18⅝"

 

0½"

  F

 

¼" 

7¼"

 

G

 

8½" 

0¼"

 

H

 

29⅞" 

33⅞"

 

I

 

5⅜" 

5⅜"

 

J

 

28⅜" 

31¼"

 

K

 

1" 

1"

 

L

 

34⅜" 

37⅜"

 

M

 

7

/

16

9¾"

FIREBOX EXTERNAL DIMENSIONS

.75"

M

G

C

H

E

F

D

I

J

B

K

.50"

.50"

L

A

Содержание 32LCUF-F

Страница 1: ...TED VENT FREE FIREBOXES INSTALLATION AND OPERATING INSTRUCTIONS MODELS 32LCUF F 32LCUF R 36LCUFC R Carefully review the instructions supplied with the decorative type unvented room heater for the mini...

Страница 2: ...n Information 6 Firebox External Dimensions 6 Minimum Hearth Dimensions 7 Location of Firebox 7 Clearances and Height Requirements 8 Firebox Framing 10 Gas Line Installation 12 Canopy Installation 13...

Страница 3: ...operate a vent free gas heater in this firebox IMPORTANT SAFETY INFORMATION 1 Due to high temperatures the appliance should be located out of traffic and away from furniture and draperies 2 Children...

Страница 4: ...nued use 20 Input ratings are shown in BTU per hour and are for elevations up to 2 000 feet For elevations above 2 000 feet input ratings should be reduced 4 percent for each 1 000 feet above sea leve...

Страница 5: ...ing Instructions 2 Canopy 4 Five 5 sheet metal screws for canopy What you will need for installation TOOLS BUILDING SUPPLIES Phillips screwdriver Square Framing materials Hammer Piping complying with...

Страница 6: ...ing or into prepared framing 2 Plumb gas line Gas connections should only be performed by an experienced licensed certified tradesman 3 Install vent free gas log heater per the instructions provided w...

Страница 7: ...indows or doors Installation must provide adequate ventilation and combustion air DO NOT INSTALL THIS FIREBOX IN A BED ROOM OR BATHROOM Location should be out of high traffic or windy or drafty areas...

Страница 8: ...back wall Figure 4 Clearance and Height Requirements 4 Floor clearance This inner chamber firebox floor must be installed at least 1 above any combustible flooring mate rial such as carpeting or aspha...

Страница 9: ...nit must be installed If a combustible mantel is installed it must meet the clearance requirements as shown in Figure 7A However if lower mantel height is desired see page 14 and Figure 7B for canopy...

Страница 10: ...pth of the enclosure The classification noncombustible material includes but is not limited to stone brick and mortar Noncombustibles are safe to overlay the black painted metal face including radiant...

Страница 11: ...mmodate the fireplace with trim installed is as follows Figure 13 Custom Cabinet Figure 14 Location of Nailing Flanges The fireplace must be installed giving full consideration to the clearance and he...

Страница 12: ...ters in addition to the regulator fitted to the heater to reduce the supply tank pressure to 13 w c maximum Any copper tubing used to supply propane L P G from the tank must be internally tinned Note...

Страница 13: ...he side frames See Figure 15 2 Align the canopy with the holes in the top frame 3 Replace the screws previously removed 4 Tighten side screws Make sure the canopy is level and secure The firebox canop...

Страница 14: ...F 32LCUF R 36LCUFC R 1 Canopy 1 71D0023 71D0023 71D0500 Screen Panel 2 070942 070942 26D4563 3 Screen Rod 2 26D0138 26D0138 26D0132K ACCESSORIES in KITS 1 Standard Brass Canopy 1 BRCU32 BRCU32 BRCU36...

Страница 15: ...or garage space 5 Locate air supply inlet at least 3 away from any applaince vent terminal 6 Avoid extremely long runs and numerous turns in the duct leading from the fireplace to the combustion air...

Страница 16: ...lamp or screws See Figure 21 DO NOT remove the cover if the outside air will not be connected WARNING Figure 20 Attaching Outside Air Starting Collar and Insulation Ring to Left Side of Fireplace Figu...

Страница 17: ...l Note If the wall covering is brick or stone use appropriate masonry fasteners If necessary splice the duct Use a model 403 duct connector to splice duct sections Installing model 403 duct connector...

Страница 18: ...18 26D4751 notes...

Страница 19: ...d Lifetime Warranty will also be void if the appliance is not operated and maintained according to the operating instructions supplied with the appliance and does not extend to 1 firebox burner assemb...

Страница 20: ...AUGUST 2008 26D4751 Rev 10 MHSC 149 Cleveland Drive Paris Kentucky 40361 www mhsc com...

Отзывы: