background image

9

UVDC/UVDR Series Unvented Fireplaces

20007433

KT145

AKU reinstall

cover plate

9/6/00   djt

KT145

Fig. 12

  Secure the inlet collar assembly.

FP1061

AKMST

rain cap

7/6/00   djt

Caulking

Duct Ter-
mination

Rain 
Cap

Wall

FP1061

Fig. 13 

 Caulk and install duct termination/rain cap in place.

Operating Precautions and Instructions

Operation is automatic. A slight negative pressure inside 
the house will open the barometric flapper valve.

Periodically inspect the duct termination for any block-
age. Correct if necessary.

Содержание UVDC

Страница 1: ...s having jurisdiction i e building inspectors fire marshals etc should be consulted before installation to determine the need to obtain a permit When installing the Blower Kit it is necessary to bring the power source to the fireplace before walls are enclosed Refer to Blower Kit instructions These fireboxes are approved as univer sal fireboxes and can be paired with any ANSI Z21 11 2 approved vent fr...

Страница 2: ...ices 7 Install Optional Outside Air Kit 8 Replacement Parts 10 Accessories 11 Servicing 11 Warranty 12 Table of Contents UVDC UVDR Certified To ANSI Z 21 91a 2002 Ventless Fireboxes for use with any ANSI Z21 11 2 Unvented Room Heaters Units UVDC36 GF1VC2 UVDR36 GF1VR2 UVDC42 GF1VC4 UVDR42 GF1VR4 A B C FP1531 hearth dimensions 9 04 djt Front Width Back Width Depth A B C UVDC36 35 23 16 UVDR36 889 mm...

Страница 3: ... K 8 8 9 9 N 22 22 32 32 O 21 21 22 22 Q 65 65 76 76 R 32 32 38 38 S 46 46 54 54 Fireplace Dimensions C G K I F N Gas Line Access Rough Opening Width C Rough Opening Height Rough Opening Depth S R Q S O J F D B A 6 C A H E F G 72025 ADF ADL 36 42 SPECS 2 04 Fig 1a UVDC UVDR specifications and framing dimensions 1 2 Clearance to Combustibles not Required at this Point 1 2 Clearance to Combustibles n...

Страница 4: ...llow the installation of 1 2 wall board or plywood flush with the face of the fireplace Only the header Fig 1 may rest on the standoffs on top of the firebox When the fireplace is installed over carpeting vinyl tile or any combustible material other than wood flooring it must be installed on a metal or wood panel extend ing its full width and depth Alternatively the carpet ing vinyl tile etc may be rem...

Страница 5: ...ions with Canopy 3c Clearance from Top of Fireplace Opening Clearance from Top of Fireplace Opening Mantel Combustible Projections Mantel Combustible Projections Clearance to Combustible Mantel Projections with out Canopy Combustible Projections above the fireplace must be within the area described by the dashed line when the firebox is equipped with the heat reducing canopy T225 3d Fig 3 Clearances...

Страница 6: ... time taken to install the firebox correctly is well worthwhile The following steps are to stop potential cold air problems Insulation of the Fireplace Enclosure When in a chase or an outside wall the fireplace en closure should be insulated like any other wall of your home Insulation should be installed on the outside wall s and the wall above the fireplace Insulate to Seal Under the Fireplace Insul...

Страница 7: ... the firebox opening where facing materials such as brick or stone are used on the face of the firebox It acts as a support firestop It should be attached to the face of the fireplace with screws and sealed to the fireplace with a heat resistant sealer WARNING The firebox screens must be in place be fore operating the fireplace WARNING These vent free fireplaces are not to be used with glass doors Hearth ...

Страница 8: ... collar to duct termina tion This will provide the least restriction to air flow No more than four 4 90 elbows can be used Duct run may be horizontal vertical inclined or any combina tion of these Fig 10 You are now ready to install the Outside Air Kit 1 Remove the screws retaining the outside air cover plate if provided Located on the left side of front open units on backside of multisided units D...

Страница 9: ...rain cap 7 6 00 djt Caulking Duct Ter mination Rain Cap Wall FP1061 Fig 13 Caulk and install duct termination rain cap in place Operating Precautions and Instructions Operation is automatic A slight negative pressure inside the house will open the barometric flapper valve Periodically inspect the duct termination for any block age Correct if necessary ...

Страница 10: ...Bottom Brick 73500 73500 73398 73398 6 Right Side Brick 73498 73498 73394 73394 7 Left Side Brick 75752 75752 73394 73394 8 Back Brick 73535 73535 73395 73395 9 Nailing Flange Bag of 4 w Screws 2253160 2253160 2253160 2253160 10 Panel Grille Louvre 65900 65900 65900 UVDC UVDR Series Unvented Fireplaces 5 7 8 6 4 1 2 3 7433 UVDC UVDR parts 8 04 9 10 CFM Corporation reserves the right to make change...

Страница 11: ...Blvd Mississauga Ontario Canada L5N 8A3 Servicing Repair and replacement work should only be done by a qualified service person Always shut off the gas supply and make sure the appli ance is cool before beginning any service operation Always check for gas leaks after servicing Accessories Decorative Louvre Trim Kits Polished brass finish LPB36 LPB42 4 Decorative Surrounds SPB36 SPB42 Blower Kit Louv...

Страница 12: ...pairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisions of this warranty is covered for six months or the remainder of the original warranty whichever is longest This warranty is limited to the repair of or replacement of part s found to be defective in material or workmanship provided that such part s have been subjected to ...

Отзывы: