1 Preface
31
1 Preface
These instructions contain important information
about
final installation of the slide-in modules
and internal covers
. Final installation takes
place once the plastering and paint work is com-
plete.
Note the enclosed safety instructions.
• For information on
shell installation
→ PP 45 / PPB 30 shell
installation instructions
• For information on the
installation of ventila-
tion components,
commissioning and
the large variety of
setting possibilities for
the ventilation system
→ PP45/PPB 30 install-
ation and commission-
ing instructions
• For
• For information on
operation
→ PP 45 / PPB 30 op-
erating instructions
• Accessory compon-
ents
→ installation instruc-
tions enclosed with the
accessories
Further instructions and videos
• Brief instructions for changing filters, setting
ventilation levels and operating modes
• Video - PP 45 Connecting the internal cover
• Video - PP 45/PPB 30 filter change
• Video - Connecting controls
• Video - Installation and teaching-in radio switch
DS 45 RC
• Videos - RLS 45 K Service menu, RLS 45 O
Service menu, RLS 45 RC Service menu
• Video - PP 45 RC Teaching-in master and
slave
• Video - PP 45 RC, PPB 30 RC installation
2 Safety
• Read
these instructions
and the
enclosed
safety instructions
carefully before installa-
tion.
• Follow the instructions.
• Pass these instructions on to the owner/operat-
ing company for safekeeping.
3 Scope of delivery
Scope of delivery depends on system con-
figuration.
PPB 30 O, PPB 30 K, PPB 30 RC ventilation
unit
● Internal cover, complete: Housing, 2x G3 air fil-
ter and front cover.
● Slide-in module including 2 fan units and 2
ceramic heat exchangers.
● 1 extension duct, 200 mm long; 1 centring ring;
2 sealing strips.
● 1 internal housing drilling template.
● These installation instructions.
4 Intended use
PPB 30
ventilation units with heat recovery are
used for air ventilation and air extraction of apart-
ments, offices and similar rooms. They are suit-
able for new buildings as well as renovation work.
The units are designed for 24h operation. The
housing unit’s ventilation system should be con-
figured in accordance with DIN 1946-6.
PPB 30
are balanced ventilation units, which are
the ideal choice for use in
exhaust air rooms
(bathroom, WC or kitchen with windows
) and
ventilate and extract air
from the rooms at the
same time. Exhaust air mode is started automat-
ically depending on the setting or can be started
manually at the touch of a button.
PPB 30
are stand-alone units or can be used in
groups with other
PPB 30
/
PP 45
units.
PPB 30
units have degree of protection IP X4. The protec-
tion zone must be determined depending on the
unit variant used.
PPB 30
are installed in exterior walls (wall thick-
ness 320-790 mm, installation position with slight
incline towards the exterior wall) and are connec-
ted to a permanently wired electrical installation.
The PPB models “O” for Object, “K” for Comfort
and the Radio Version “RC” are available. The
units are operated using an RLS…/ DS 45 RC
room air control suitable for the type.
Содержание PPB 30 O
Страница 3: ...Steuerungskonzept PPB 30 3 Steuerungskonzept PPB 30...
Страница 4: ...Steuerungskonzept PP 45 RC PPB 30 RC Funk 4 Steuerungskonzept PP 45 RC PPB 30 RC Funk...
Страница 29: ...PPB 30 control concept 29 PPB 30 control concept...
Страница 30: ...PP 45 RC PPB 30 RC wireless control concept 30 PP 45 RC PPB 30 RC wireless control concept...
Страница 53: ...Concept de commande PPB 30 53 Concept de commande PPB 30...
Страница 54: ...Concept de commande PP 45 RC PPB 30 RC radio 54 Concept de commande PP 45 RC PPB 30 RC radio...
Страница 95: ...Produktdatenbl tter Product data sheets Fiches techniques du produit 95 PPB 30 O...