Page
4
SET UP
The MCX-1 has two tanks (plus an extra New Coolant Tank) which are installed and
connected from the rear. Quick connect couplers are mounted on the hoses which connect
these tanks to the MCX-1. A green hose connects to the small New Coolant Tank and a black
hose connects to the large Waste Tank.
1.
Slide the New Coolant Tank to the rear and sit it on the floor.
2.
Remove the tank cap and fill the tank with new coolant and water in the proportions
specified by the coolant supplier. The tank can be disconnected and moved to a bulk
storage and fill area if desired. A plug is provided on the cap to prevent spillage during
transport.
3.
Replace the tank cap and position the tank in the MCX-1. Make sure the green hose is
securely connected. Slide the tank to the front so the liquid level can be seen through the
front panel slot.
4.
Make sure the plug
Make sure the plug
Make sure the plug
Make sure the plugs are removed from the caps on
s are removed from the caps on
s are removed from the caps on
s are removed from the caps on the waste tank and the new
the waste tank and the new
the waste tank and the new
the waste tank and the new
coolant tank. This is required for venting the tanks during operation.
coolant tank. This is required for venting the tanks during operation.
coolant tank. This is required for venting the tanks during operation.
coolant tank. This is required for venting the tanks during operation.
5.
Fasten the clips on the tank strap to secure the tanks in the MCX-1.
New Coolant Tank
Coupler
Green Hose
Quick
Green Hose
Black Hose
Tank Cap & Plug
(Small)
New Coolant
OF
F
& O
VE
RFL
OW
LOW
ER
RA
DIA
TOR
OFF
EXC
HAN
GE C
OO
LA
NT O
R
FIL
L R
ADIA
TO
R &
O
VER
FLO
W
& O
VER
FLO
W
L OW
ER
RA
D IA
TOR
EM
PTY
W
AS
TE T
ANK
EXC
HAN
GE
CO
OLA
NT
& O
VER
FLO
W
FIL
L R
ADIA
TO
R
OFF
EM
PT
Y W
AST
E T
AN
K
Содержание MCX-1
Страница 18: ...Page 17 FLOW WIRING DIAGRAM...
Страница 19: ...Page 18 NOTES...
Страница 20: ...Page 19 NOTES...
Страница 21: ...Page 20 NOTES...